On this page 5
When a permit is required
Permit triggers and exempt work for Centreville
A building permit is required within the Town of Centreville for construction, reconstruction, enlargement, alteration, or demolition of any building or structure.
Note: Not specified in available public sources. The Maryland State Building Code IRC section on exempt work generally applies (e.g., certain ordinary repairs); verify with Town Hall for specific exemptions applicable within Centreville.
- Building permit application
- Site plan
- Building plans
- Contractor license documentation
- Building code
- Maryland State Building Code (2021 IBC, 2021 IRC, 2020 NEC and Maryland amendments) as enforced by the town.
- Permit validity
- Not confirmed from public sources; contact Town Hall.
- Owner-builder
- Not confirmed from public sources; contact Town Hall.
- Contractor requirements
- Maryland Home Builders license (new construction) and MHIC license (renovations/repairs) apply as statewide requirements. The town may have additional local contractor registration requirements; confirm with Town Hall.
Application process
Typical processing: Not published; contact Town Hall at (410) 758-1180 for current estimates.
- 01 Confirm the property is within Centreville town limits.
- 02 Contact Town Hall at (410) 758-1180 to confirm permit type needed and current submittal requirements.
- 03 Obtain relevant application forms from https://www.townofcentreville.org/forms or in person at Town Hall.
- 04 Prepare site plan, building plans, contractor information, and any zoning compliance documentation as required.
- 05 Submit application in person at Town Hall (101 Lawyers Row, Centreville, MD 21617).
- 06 Await review and approval; the town coordinates with state and county agencies as needed.
- 07 Schedule inspections through MDIA (Middle Department Inspection Agency) at 410-822-8300.
- 08 Upon completion of all inspections, obtain Certificate of Occupancy from the town.
Typical processing time: Not published; contact Town Hall at (410) 758-1180 for current estimates.
Source: Town of Centreville Department of Planning and Zoning ↗
Required inspections
Scheduling and sequence
- MDIA at (410) 822-8300 (phone)
- Scheduling deadline
- Call at least 24 hours in advance.
Typical sequence: Follows Maryland State Building Code inspection requirements (footing, foundation, framing, insulation, final for residential work).
Frequently asked
Common questions about Centreville permits
01 Do I need a building permit in Centreville, MD? ▸
02 How do I apply for a building permit in Centreville, MD? ▸
03 How long does it take to get a building permit in Centreville, MD? ▸
04 How do I schedule a building inspection in Centreville, MD? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Centreville Department of Planning and Zoning before applying. Jaspector is not legal advice.