When a permit is required
Permit triggers and exempt work for Mountain Lake Park
Erecting most structures or changing the use of land or buildings within Mountain Lake Park requires a town zoning permit. A county building permit is also required in most cases. Certain smaller structures (fences, signs, and small sheds) require only a zoning permit.
- Exempt Accessory structures 240 square feet and under do not require a county building permit
Note: A town zoning permit may still be required for small structures within Mountain Lake Park.
- Zoning permit application
- Site layout plan drawn to scale (licensed surveyor required for new homes)
- Two sets of building plans for county permit submission
- Building code
- 2021 International Building Code (IBC), 2021 International Residential Code (IRC), and 2021 International Energy Conservation Code (IECC) as adopted by Garrett County.
- Permit validity
- Construction must begin within one year of permit issuance or the permit becomes void; also void if no construction activity for over one year.
- Owner-builder
- A landowner may serve as their own general contractor subject to county requirements. All builders of new homes must be registered with the Maryland Home Builder Registration Unit (MHBR).
- Contractor requirements
- Properly licensed contractors are required. Maryland MHIC licensing applies to home improvement work. All new home builders must be registered with MHBR. Electrical, plumbing, and mechanical trade work is subject to Maryland state licensing.
Application process
Typical processing: Not published as a single standard.
- 01 Determine whether the Mountain Lake Park project requires a town zoning permit. Most new structures and use changes require one.
- 02 Prepare a site layout plan drawn to scale showing the location and dimensions of all proposed and existing structures relative to property and street lines. For new homes, the site plan must be prepared by a licensed surveyor.
- 03 Submit the zoning permit application and site plan to Mountain Lake Park Town Hall and pay the required zoning permit fee at Town Hall.
- 04 Town Hall forwards the application to the Garrett County Planning & Land Management Division at the Courthouse for final review and approval.
- 05 If a county building permit is also required, bring the approved zoning permit to the county Permits & Inspections Division or apply via Citizen Connect for residential projects, and submit building plans and supporting documents.
- 06 Pay county building permit fees.
- 07 Receive issued permits. Post the placard on site. Construction may not begin until all required permits are issued.
- 08 Schedule county building inspections via Citizen Connect or by calling 301-334-7470.
Typical processing time: Not published as a single standard.
Required inspections
Scheduling and sequence
- Citizen Connect portal (online)
- 301-334-7470 (phone)
- Scheduling deadline
- Requests should be made in advance; allow at least 24 hours.
- Inspection hours
- Monday through Friday, 8:30 a.m. to 4:30 p.m.
- Time windows
- A specific inspection time cannot be set.
Typical sequence: Same county inspection process.
Frequently asked
Common questions about Mountain Lake Park permits
01 Do I need a building permit in Mountain Lake Park, MD? ▸
02 How do I apply for a building permit in Mountain Lake Park, MD? ▸
03 How long does it take to get a building permit in Mountain Lake Park, MD? ▸
04 What work is exempt from building permits in Mountain Lake Park, MD? ▸
05 How do I schedule a building inspection in Mountain Lake Park, MD? ▸