City of Saco

How to apply for a building permit in City of Saco, Maine. Permit authority, application steps, fees, and inspection requirements.

Code adoption
MUBEC (IBC, IRC, IECC)
Last verified
April 2026
On this page 6
§ 01

Permit authority

Code Enforcement Office, City of Saco

Street address
300 Main Street, Saco, ME 04072
Coverage
Full city jurisdiction; Director of Code Enforcement is David Twomey
Online portal
iWorQ Citizen Portal
iWorQ Citizen Portal
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Saco

Any erection, alteration, enlargement, demolition, or change of use of a structure

Ordinary maintenance and repair not affecting structural or life safety elements
Replacement of roofing, siding, or windows with no structural changes (per common MUBEC exemption; confirm with office for Saco-specific list)
Agricultural structures (state exemption)
  • Exempt Ordinary maintenance and repair not affecting structural or life safety elements
  • Exempt Replacement of roofing, siding, or windows with no structural changes (per common MUBEC exemption; confirm with office for Saco-specific list)
  • Exempt Agricultural structures (state exemption)

Note: Verify current exempt list with Code Enforcement Office at (207) 284-6983

Required documents
  • Completed application
  • two sets of scaled plans (site plan
  • floor plan
  • elevations
  • cross sections)
Building code
MUBEC (IBC, IRC, IECC)
Permit validity
Not specified in public sources; contact office
Owner-builder
Homeowners may pull their own permits; licensed trades required for plumbing and electrical unless homeowner qualifies under state rules
Contractor requirements
Maine-licensed plumbers and electricians required
§ 03

Application process

Typical processing: Approximately 30 business days due to volume

  1. 01
    Review permit requirements at sacomaine.org/departments/code_enforcement/building_permits.php
  2. 02
    Create account in iWorQ portal or download PDF application
  3. 03
    Submit application with two sets of plans
  4. 04
    Code Enforcement staff review for zoning and code compliance
  5. 05
    Pay fee upon approval
  6. 06
    Permit issued; post on job site before beginning work

Typical processing time: Approximately 30 business days due to volume

Source: Code Enforcement Office, City of Saco ↗

§ 04

Fee schedule

Saco building permit fees

Fee type
Amount
01
Minimum permit fee
Not confirmed; see fee schedule page
02
Plan check fee
Included in permit review; not separately listed
03
Permit fee formula
Valuation-based; see published schedule
04
Reinspection fee
Double fee if work started before permit issued (per common Maine practice; confirm with office)

Pay online via iWorQ or in person at 300 Main Street

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

Inspection hours
Monday through Friday, 7:30 AM to 4:00 PM

Typical sequence: Foundation, framing, insulation, final

§ 06

Frequently asked

Common questions about Saco permits

01 Do I need a building permit in Saco, ME?
Any erection, alteration, enlargement, demolition, or change of use of a structure
02 How much does a building permit cost in Saco, ME?
Building permit fees in Saco, ME are set by the local building department and vary by project type and valuation. The minimum permit fee is Not confirmed; see fee schedule page. Fees are calculated as: Valuation-based; see published schedule. Plan check fee: Included in permit review; not separately listed.
03 How do I apply for a building permit in Saco, ME?
To apply for a building permit in Saco, ME, follow these steps: 1. Review permit requirements at sacomaine.org/departments/code_enforcement/building_permits.php 2. Create account in iWorQ portal or download PDF application 3. Submit application with two sets of plans 4. Code Enforcement staff review for zoning and code compliance 5. Pay fee upon approval 6. Permit issued; post on job site before beginning work
04 How long does it take to get a building permit in Saco, ME?
Building permit processing times in Saco, ME typically run Approximately 30 business days due to volume. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Saco, ME?
Not all construction work requires a permit in Saco, ME. The following work is generally exempt: Ordinary maintenance and repair not affecting structural or life safety elements; Replacement of roofing, siding, or windows with no structural changes (per common MUBEC exemption; confirm with office for Saco-specific list); Agricultural structures (state exemption). Note: Verify current exempt list with Code Enforcement Office at (207) 284-6983 When in doubt, confirm with the local building department before starting work.
last verified April 2026 source Code Enforcement Office, City of Saco ↗ entry id permits/maine/york/saco

Educational reference. Permit rules and fees change — confirm current requirements directly with Code Enforcement Office, City of Saco before applying. Jaspector is not legal advice.