jaspector
City building permits

Franklin

How to apply for a building permit in Franklin, Louisiana. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Franklin Office of Zoning, Permits and Inspections

Street address
300 Iberia Street, P.O. Box 567, Franklin, LA 70538
Coverage
City of Franklin
Online portal
Permit portal
Franklin eGov document center and forms
§ 02

When a permit is required

Permit triggers and exempt work for Franklin

Franklin's application form covers building, zoning, and related permit work; the city's code chapter is titled Buildings and Building Regulations.

Required documents
  • Completed application; owner or authorized agent information; contractor information; flood zone or elevation information for new construction or moving a home; contractor license, occupational license, and insurance documents when applicable; any required trade registration documents.
Building code
Franklin's permit packet references the city code chapter on Buildings and Building Regulations and the city's building code plan review process. The surfaced packet does not clearly state a single adopted edition in the snippets reviewed.
Owner-builder
The application states only the owner or the owner's authorized agent can obtain a permit.
Contractor requirements
Franklin requires city registration for electrical, plumbing, and mechanical/HVAC work. The city material also states unlicensed builders or unregistered home improvement contractors may not do residential work over $7,500 or commercial work over $50,000, and state-registered home improvement contractors may do residential work not exceeding $75,000.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Review the permit application and determine whether the work is in a zoning-controlled area or flood zone.
  2. 02
    Submit the application with owner, contractor, and project details to the Zoning, Permits and Inspections office.
  3. 03
    Provide required supporting documents, including license and insurance information when applicable.
  4. 04
    For some projects, secure state or city contractor registrations before permit issuance.
  5. 05
    Permit is issued only after the application is completed and approved.

Source: City of Franklin Office of Zoning, Permits and Inspections ↗

§ 04

Fee schedule

Franklin building permit fees

Fee type
Amount
01
Minimum permit fee
City trade registration fee is $100 inside city limits or $200 outside city limits for plumbers, HVAC, and electricians; other contractors are noted as no charge for that registration item.
§ 05

Required inspections

Scheduling and sequence

How to schedule
  • For gas test inspections, the city says call 337-828-6303 after the permit is obtained and the system is ready. (phone)

Typical sequence: Permit first, correct hazards, hold test pressure for at least 15 minutes, then call for inspection. If approved, the plumbing inspector contacts the gas company for service restoration.

If inspection is not approved, corrections are issued and the applicant must call back for reinspection.

§ 06

Frequently asked

Common questions about Franklin permits

01 Do I need a building permit in Franklin, LA?
Franklin's application form covers building, zoning, and related permit work; the city's code chapter is titled Buildings and Building Regulations.
02 How much does a building permit cost in Franklin, LA?
Building permit fees in Franklin, LA are set by the local building department and vary by project type and valuation. The minimum permit fee is City trade registration fee is $100 inside city limits or $200 outside city limits for plumbers, HVAC, and electricians; other contractors are noted as no charge for that registration item..
03 How do I apply for a building permit in Franklin, LA?
To apply for a building permit in Franklin, LA, follow these steps: 1. Review the permit application and determine whether the work is in a zoning-controlled area or flood zone. 2. Submit the application with owner, contractor, and project details to the Zoning, Permits and Inspections office. 3. Provide required supporting documents, including license and insurance information when applicable. 4. For some projects, secure state or city contractor registrations before permit issuance. 5. Permit is issued only after the application is completed and approved.
04 How do I schedule a building inspection in Franklin, LA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Franklin, LA via: For gas test inspections, the city says call 337-828-6303 after the permit is obtained and the system is ready..
last verified April 2026 source City of Franklin Office of Zoning, Permits and Inspections ↗ entry id permits/louisiana/st-mary/franklin

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Franklin Office of Zoning, Permits and Inspections before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in St Mary Parish.

Same county, different permit office. Click for that jurisdiction's full guide.

All St Mary Parish jurisdictions →