How to apply for a building permit in Town of Haughton, Louisiana. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of Haughton permit administration through Town Hall and Clerk's Office

Street address
118 W. McKinley Avenue, Haughton, LA 71037
Coverage
Covers work within the Town of Haughton. Public-facing permit information is split between the permit page, clerk page, application PDFs, and Haughton MPC pages.
Online portal
MGO Connect / My Government Online
MGO Connect / My Government Online
§ 02

When a permit is required

Permit triggers and exempt work for Haughton

Permit application covers commercial, industrial, and residential construction, additions, attached and detached buildings, relocations, manufactured homes, modular buildings, remodels, swimming pools, temporary electrical poles, and trade permits for electrical, plumbing, and mechanical work.

Required documents
  • Current state license
  • Photo ID
  • General liability insurance
  • Completed permit application
  • Notarized owner-builder affidavit if claiming exemption
  • Flood zone information
  • No-rise certificate if applicable
  • Elevation certificates in SFHA cases
  • Project size and cost details
  • Utility information
  • Fire Marshal project number where NFPA 101 review applies
Building code
Public-facing Haughton sources reviewed do not clearly publish one consolidated adopted-code list with edition numbers. Permit application references Louisiana Act 12 of the 2005 First Extraordinary Session, local permitting and flood damage prevention ordinances.
Permit validity
Permit becomes invalid if work is not started within 180 days of issuance or if authorized work is suspended or abandoned for 180 days.
Owner-builder
Permit application specifically requires an LSLBC notarized affidavit for homeowners claiming licensure exemption.
Contractor requirements
All contractors and subcontractors performing construction, electrical, plumbing, or mechanical work within town limits must have a current Town of Haughton registration. Registration requires current state license, photo ID, general liability insurance, and a fee.

Source: Town of Haughton permit administration through Town Hall and Clerk's Office ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    If you are a contractor or subcontractor, complete Town of Haughton registration first. Anyone performing construction, electrical, plumbing, or mechanical work inside town limits must hold a current Town of Haughton registration.
  2. 02
    Gather registration materials: current state license, photo ID, general liability insurance, and registration fee.
  3. 03
    Start the permit application through the MGO Connect portal or use the town permit application form.
  4. 04
    If claiming owner-builder status, provide the required Louisiana State Licensing Board for Contractors notarized affidavit.
  5. 05
    Submit floodplain documentation when applicable, including flood panel data, no-rise certification if in a floodway, and elevation certificate stages if located in a special flood hazard area.
  6. 06
    After review and fee assessment, obtain permit issuance, complete inspections, and maintain compliance throughout construction.

Source: Town of Haughton permit administration through Town Hall and Clerk's Office ↗

§ 04

Fee schedule

Haughton building permit fees

Fee type
Amount
01
Plan check fee
A plan review fee is assessed, but the public formula not clearly posted
02
Permit fee formula
Permit application includes fields for plan review fee, inspection fee, permit fee, and total fees, but town does not clearly publish the calculation formula
03
Reinspection fee
Application warns all project work and previous inspections subject to reinspection, but public reinspection fee schedule not clearly identified

Contractor registration may be paid over the phone with a card, by check, or cash. Broader permit-payment processing rules not clearly posted.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Monday through Thursday 8:30 a.m. to 4:00 p.m.; Friday 8:30 a.m. to 12:00 p.m.

Source: Town of Haughton permit administration through Town Hall and Clerk's Office ↗

§ 06

Frequently asked

Common questions about Haughton permits

01 Do I need a building permit in Haughton, LA?
Permit application covers commercial, industrial, and residential construction, additions, attached and detached buildings, relocations, manufactured homes, modular buildings, remodels, swimming pools, temporary electrical poles, and trade permits for electrical, plumbing, and mechanical work.
02 How much does a building permit cost in Haughton, LA?
Building permit fees in Haughton, LA are set by the local building department and vary by project type and valuation. Fees are calculated as: Permit application includes fields for plan review fee, inspection fee, permit fee, and total fees, but town does not clearly publish the calculation formula. Plan check fee: A plan review fee is assessed, but the public formula not clearly posted.
03 How do I apply for a building permit in Haughton, LA?
To apply for a building permit in Haughton, LA, follow these steps: 1. If you are a contractor or subcontractor, complete Town of Haughton registration first. Anyone performing construction, electrical, plumbing, or mechanical work inside town limits must hold a current Town of Haughton registration. 2. Gather registration materials: current state license, photo ID, general liability insurance, and registration fee. 3. Start the permit application through the MGO Connect portal or use the town permit application form. 4. If claiming owner-builder status, provide the required Louisiana State Licensing Board for Contractors notarized affidavit. 5. Submit floodplain documentation when applicable, including flood panel data, no-rise certification if in a floodway, and elevation certificate stages if located in a special flood hazard area. 6. After review and fee assessment, obtain permit issuance, complete inspections, and maintain compliance throughout construction.
04 How do I schedule a building inspection in Haughton, LA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Haughton, LA via: MGO Connect portal.
last verified April 2026 source Town of Haughton permit administration through Town Hall and Clerk's Office ↗ entry id permits/louisiana/bossier/haughton

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Haughton permit administration through Town Hall and Clerk's Office before applying. Jaspector is not legal advice.