Permit authority

City of Napoleonville / Assumption Parish Permit Office

Street address
105 Martin Luther King Drive, Napoleonville, LA 70390
Coverage
City of Napoleonville, the only incorporated municipality in Assumption Parish.
§ 02

When a permit is required

Permit triggers and exempt work for Napoleonville

State law requires permits for construction projects. Permitting for Napoleonville appears to be handled through the Assumption Parish Permit Office. If property is connected to city water, a perc test is needed before placing a septic system.

Note: Specific exempt work categories are not published in accessible online sources. Contact the City or Assumption Parish Permit Office for details.

Required documents
  • Property survey by professional
  • Building plans showing structure placement
  • All documents required by the Assumption Parish Permit Office
  • Perc test results if on-site septic system is proposed
Building code
2021 International Building Code and 2021 International Residential Code per the Louisiana State Uniform Construction Code.
Contractor requirements
Same Louisiana State Contractor License thresholds apply for work above state thresholds. Trade licensing is governed by the Louisiana State Licensing Board for Contractors.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Obtain and complete the permit application.
  2. 02
    Submit the application with required documents in person at the permit office.
  3. 03
    Plan review is conducted by certified staff.
  4. 04
    Pay permit fees.
  5. 05
    Receive permit issuance upon approval.
  6. 06
    Schedule inspections as required by project type.
  7. 07
    Obtain final approval and occupancy certificate if required.

Source: City of Napoleonville / Assumption Parish Permit Office ↗

§ 04

Required inspections

Scheduling and sequence

Inspection hours
Monday-Friday, 8:00 AM to 4:00 PM

Typical sequence: Typical Louisiana inspection sequence includes foundation inspection, framing inspection, and completion or final inspection.

§ 05

Frequently asked

Common questions about Napoleonville permits

01 Do I need a building permit in Napoleonville, LA?
State law requires permits for construction projects. Permitting for Napoleonville appears to be handled through the Assumption Parish Permit Office. If property is connected to city water, a perc test is needed before placing a septic system.
02 How do I apply for a building permit in Napoleonville, LA?
To apply for a building permit in Napoleonville, LA, follow these steps: 1. Obtain and complete the permit application. 2. Submit the application with required documents in person at the permit office. 3. Plan review is conducted by certified staff. 4. Pay permit fees. 5. Receive permit issuance upon approval. 6. Schedule inspections as required by project type. 7. Obtain final approval and occupancy certificate if required.
last verified April 2026 source City of Napoleonville / Assumption Parish Permit Office ↗ entry id permits/louisiana/assumption/napoleonville

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Napoleonville / Assumption Parish Permit Office before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Assumption Parish.

Same county, different permit office. Click for that jurisdiction's full guide.

All Assumption Parish jurisdictions →