On this page 6
When a permit is required
Permit triggers and exempt work for Campton
New construction, additions, garages, accessory structures, attached or detached ADUs, commercial and industrial buildings, demolitions, pools, signs, driveways, and any other work listed in the fee schedule.
Note: The published fee sheet does not list exempt work. Refer to Kentucky Building Code Section 105.2 for statewide exemptions.
- Completed Zoning Compliance Application
- Payment calculated from fee schedule
- Property staking information (if applicable)
- Supporting plans or site information as needed
- Building code
- 2018 Kentucky Building Code and 2018 Kentucky Residential Code
- Permit validity
- Not detailed in the published materials; contact the city clerk for validity periods.
- Owner-builder
- Not addressed in the fee sheet; consult the city clerk for any owner-builder provisions.
- Contractor requirements
- State licensing requirements for plumbing, electrical, HVAC, and other trades still apply as outlined by DHBC.
Application process
Typical processing: Up to a month after the ZCA and payment are received
- 01 Identify the project type (single-family dwelling, addition, garage, accessory structure, ADU, commercial, industrial, demolition, pool, sign, driveway, etc.) and calculate the required base and square-footage fees.
- 02 Fill out the Zoning Compliance Application completely, include the calculated payment, and submit the packet to the City Clerk/Treasurer (Tonya Landsaw) for review.
- 03 The Code Compliance Officer reviews the application, performs site visits as needed (a $30 fee applies if the property is not staked), and issues the permit once compliance is confirmed.
Typical processing time: Up to a month after the ZCA and payment are received
Source: City of Campton Code Compliance / Zoning Compliance Officer ↗
Fee schedule
Campton building permit fees
The process begins only after the ZCA is fully filled out with payment. Contact the city clerk to learn acceptable payment methods.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- City Clerk or Code Compliance Officer at (606) 668-3574 (phone)
- Inspection hours
- City officials can be reached at the clerk's office phone during business hours (specific hours not listed)
Typical sequence: The Code Compliance Officer may visit the site to verify staking and compliance. The visit is part of the initial review and helps avoid extra fees.
Frequently asked
Common questions about Campton permits
01 Do I need a building permit in Campton, KY? ▸
02 How much does a building permit cost in Campton, KY? ▸
03 How do I apply for a building permit in Campton, KY? ▸
04 How long does it take to get a building permit in Campton, KY? ▸
05 How do I schedule a building inspection in Campton, KY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Campton Code Compliance / Zoning Compliance Officer before applying. Jaspector is not legal advice.