When a permit is required
Permit triggers and exempt work for Goshen
No building, outbuilding, driveway, grading, wall, fence, deck, or treehouse may be altered without a city building permit, related committee approval, and the county building permit.
Note: The city ordinance does not list additional exempt projects beyond the valuation-based exemptions in the county schedule.
- Construction plans and drawings
- Site plan
- Plot plan
- Elevations
- Written description of materials
- Oldham County building permit application packet
- County-required blueprints or line drawings (as conditions of approval)
- Building code
- Goshen enforces the Kentucky Building Code through its land-usage ordinance and requires proof of a county building permit before construction begins.
- Permit validity
- City permits must be completed within the ordinance timelines (180 days for new homes/garages, 90 days for other work) or extensions sought in writing 14 days before the deadline.
- Owner-builder
- The ordinance applies to all property owners equally; no separate owner-builder carve-out is published.
- Contractor requirements
- Mechanical, electrical, and plumbing work must still proceed through the county inspection offices licensing regime.
Source: City of Goshen Architectural Control Committee and Land Usage office ↗
Application process
Typical processing: The committee has up to 45 days to act on submissions. The county's plan review timing should be confirmed by calling 502-222-3967.
- 01 File construction plans, site plans, and specifications with Goshen's Architectural Control Committee; if the committee does not act within 45 days of a complete submission, approval is deemed granted unless an injunction is in place.
- 02 Secure committee approval (with any required conditions such as a plot plan or typed material description) and apply for the $50 city building permit.
- 03 Simultaneously obtain the county building permit from Oldham County Buildings & Inspections.
- 04 Post both permits at the work site.
- 05 Complete construction within 90 days (other work) or 180 days (new homes/garages); request the final inspection to release the refunded deposit.
Typical processing time: The committee has up to 45 days to act on submissions. The county's plan review timing should be confirmed by calling 502-222-3967.
Source: City of Goshen Architectural Control Committee and Land Usage office ↗
Fee schedule
Effective 2022
Pay city fees through Goshen City Hall (call 502-228-2377) and pay valuation-based charges at the Oldham County building office.
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2022) before budgeting.
Required inspections
Scheduling and sequence
- 502-222-3967 (Oldham County) (phone)
- PermitsInspections@OldhamCountyKY.gov (email)
- Inspection hours
- Monday–Friday, 8:00 a.m. to 4:30 p.m.
Typical sequence: County monthly reports list the same footprint, framing, and final visits used countywide; the city requires a final inspection before refunding the $50 deposit.
Source: City of Goshen Architectural Control Committee and Land Usage office ↗
Frequently asked
Common questions about Goshen permits
01 Do I need a building permit in Goshen, KY? ▸
02 How much does a building permit cost in Goshen, KY? ▸
03 How do I apply for a building permit in Goshen, KY? ▸
04 How long does it take to get a building permit in Goshen, KY? ▸
05 How do I schedule a building inspection in Goshen, KY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Goshen Architectural Control Committee and Land Usage office before applying. Jaspector is not legal advice.