On this page 6
When a permit is required
Permit triggers and exempt work for Camargo
Camargo's Ordinance No. 900.10 requires a permit before any mobile home is moved into or set up within the city; general construction remains subject to the statewide Kentucky building and residential codes.
Note: No public exempt-work list was located on the Camargo ordinances or forms pages; applicants should confirm exceptions directly with the clerk.
- Application
- Survey plat showing lot meets minimum size and setback requirements
- Appraisal (for pre-owned mobile homes)
- Building code
- 2015 International Residential Code with 2018 Kentucky Residential Code amendments
- Permit validity
- Not addressed in the ordinance beyond issuance by the clerk.
- Owner-builder
- The owner must secure the permit before placement; the clerk confirms the owner's authorization on the application.
- Contractor requirements
- The ordinance requires the appraisal to be completed by a licensed appraiser; no additional local contractor licensing is listed.
Application process
Typical processing: Not specified in the ordinance or on the city's permit pages; follow up with the clerk.
- 01 For mobile homes, submit the application to the City Clerk before relocating the unit, attaching a survey plat that demonstrates the lot meets the ordinance's lot-size and setback thresholds.
- 02 Include an appraisal (when the unit is not brand new) that certifies a minimum value, pay the permit fee and certify that the mobile home is newer than 10 years; once all criteria are met, the clerk or designated inspector issues the permit.
- 03 Contact the City Clerk for inspection scheduling or clarifications after issuance.
Typical processing time: Not specified in the ordinance or on the city's permit pages; follow up with the clerk.
Source: City Clerk/Treasurer's Office ↗
Fee schedule
Camargo building permit fees
Permits are issued after submission of all attachments and payment of the fee to the City Clerk.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (859) 498-9075 (phone)
Typical sequence: Not described publicly; follow clerk or inspector guidance after permit issuance.
Frequently asked
Common questions about Camargo permits
01 Do I need a building permit in Camargo, KY? ▸
02 How much does a building permit cost in Camargo, KY? ▸
03 How do I apply for a building permit in Camargo, KY? ▸
04 How long does it take to get a building permit in Camargo, KY? ▸
05 How do I schedule a building inspection in Camargo, KY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City Clerk/Treasurer's Office before applying. Jaspector is not legal advice.