When a permit is required
Permit triggers and exempt work for Germantown
All work that constructs, enlarges, alters, repairs, relocates, demolishes, or changes the occupancy of structures or their electrical/mechanical/plumbing systems unless it is cosmetic or routine maintenance.
- Exempt Cosmetic modifications and routine maintenance repairs do not require a remodeling permit.
- Site plan showing lot dimensions, setbacks, easements, utilities, driveway, and fences
- Labeled floor plans for each story
- Typical bearing-wall cross-section from footing to roof deck
- Floor framing plans for each level
- Contractor/subcontractor and owner contact information
- Estimated construction cost
- Subcontractor list and insurance certifications
- Owner authorization when the applicant is not the owner
- Building code
- Kentucky Building Code and Kentucky Residential Code, administered through the shared city/county building inspector.
- Permit validity
- The permit remains active until the final inspection is approved and the certificate of occupancy is recorded.
- Owner-builder
- Owner authorization is required for non-owner applicants, and all contractors/subcontractors must carry the workers' compensation and unemployment insurance mandated by the state statutes cited on the application.
- Contractor requirements
- Contractors must meet the insurance requirements noted on the application; the inspector also enforces the list of approved private electrical inspectors.
Application process
Typical processing: Approximately one week after a complete application is filed.
- 01 Identify the permit type with the inspector (new construction, remodel, etc.) and gather the proper PDF form from the Revize Document Center.
- 02 Submit the signed form with the required plan sheets (site, floor, cross-section, floor framing), estimated cost, contractor and owner details, and insurance certifications.
- 03 Deliver the completed application to the building office by mail or in person, then call for an appointment for review.
- 04 The building office issues the permit when all materials are complete (typically within a week for residential projects).
- 05 Schedule and pass the necessary inspections, culminating in the certificate of occupancy entry to close the permit.
Typical processing time: Approximately one week after a complete application is filed.
Fee schedule
Germantown building permit fees
Submit fees and completed application directly to the building inspection office.
Required inspections
Scheduling and sequence
- (606) 564-2525 (phone)
- Inspection hours
- Monday through Friday, 8:00 AM to 4:30 PM
Typical sequence: Standard stage inspections and a final inspection lead to the certificate of occupancy.
Frequently asked
Common questions about Germantown permits
01 Do I need a building permit in Germantown, KY? ▸
02 How much does a building permit cost in Germantown, KY? ▸
03 How do I apply for a building permit in Germantown, KY? ▸
04 How long does it take to get a building permit in Germantown, KY? ▸
05 What work is exempt from building permits in Germantown, KY? ▸
06 How do I schedule a building inspection in Germantown, KY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Mason County Building Inspection before applying. Jaspector is not legal advice.