On this page 6
When a permit is required
Permit triggers and exempt work for Crestview Hills
Covered building, zoning, electrical, HVAC, and related work requires the applicable PDS permit.
- Exempt One-story detached accessory structures up to 200 square feet
- Exempt Fences not over 7 feet high
- Exempt Sidewalks and driveways within the code exemption
- Exempt Painting and similar finish work
- Exempt Swings and playground equipment
- Exempt Replacement windows and supported awnings
- Exempt New siding or residing
- Exempt Ordinary reroofing without structural work
- Exempt Ordinary nonstructural repairs
- Permit validity/expiration: PDS expiration standard is 6 months to start, 6 months of stopped work, or no inspections.
- Building code
- Kentucky Building Code and related Kentucky codes under the PDS local enforcement program; Crestview Hills zoning is administered by PDS.
- Permit validity
- PDS expiration standard is 6 months to start, 6 months of stopped work, or no inspections.
- Owner-builder
- Owner or authorized agent may sign and submit public PDS forms.
- Contractor requirements
- Regulated trades follow Kentucky state licensing rules.
Application process
Typical processing: Electrical about 5 business days; zoning-only 1 to 3 business days; residential and commercial about 12 business days.
- 01 Confirm permit scope and any zoning component with PDS.
- 02 Apply through GovBuilt or use downloadable forms.
- 03 Upload or submit plans, site information, and required checklists.
- 04 PDS reviews zoning and building compliance.
- 05 Pay permit fees.
- 06 Address corrections if issued.
- 07 Receive the permit before construction starts.
- 08 Call PDS for inspections through project completion.
Typical processing time: Electrical about 5 business days; zoning-only 1 to 3 business days; residential and commercial about 12 business days.
Source: Planning and Development Services of Kenton County (PDS), Building Codes Administration ↗
Fee schedule
Crestview Hills building permit fees
Fees are staged by permit class and are nonrefundable per the schedules.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Call 859-957-2408 (phone)
- Inspection hours
- No detailed windows posted
Typical sequence: PDS review and staged field inspections through final
Frequently asked
Common questions about Crestview Hills permits
01 Do I need a building permit in Crestview Hills, KY? ▸
02 How much does a building permit cost in Crestview Hills, KY? ▸
03 How do I apply for a building permit in Crestview Hills, KY? ▸
04 How long does it take to get a building permit in Crestview Hills, KY? ▸
05 What work is exempt from building permits in Crestview Hills, KY? ▸
06 How do I schedule a building inspection in Crestview Hills, KY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Planning and Development Services of Kenton County (PDS), Building Codes Administration before applying. Jaspector is not legal advice.