jaspector
§ IA Lee County
City building permits

4) Donnellson

How to apply for a building permit in 4) Donnellson, Iowa. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Not published. Thin data.
Min. permit fee
$25.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Permits and Inspections Department

Street address
802 Pershing Ave., Donnellson, IA 52625
Coverage
City of Donnellson.
§ 02

When a permit is required

Permit triggers and exempt work for 4) Donnellson

No building or other structure may be erected or altered without a permit. The permit form also says permits are required for new homes, additions, patios, decks, porches, garages, accessory buildings, or any work changing outside dimensions of an existing building.

The permit form states a permit is not required for interior remodeling, roofing, window replacement, or siding a building.
The permit form states the construction of a fence does not require a building permit, but the fence still must comply with chapter standards.
  • Exempt The permit form states a permit is not required for interior remodeling, roofing, window replacement, or siding a building.
  • Exempt The permit form states the construction of a fence does not require a building permit, but the fence still must comply with chapter standards.
Required documents
  • Plot diagram showing lot lines, exact location, dimensions of all existing and proposed structures, plus application details.
Building code
The permit form states it is issued pursuant to Chapter 155 Building and Land Use Regulations of the City Code of Donnellson.
Owner-builder
Not published. Thin data.
Contractor requirements
Not published. Thin data.
§ 03

Application process

Typical processing: Not published. Thin data.

  1. 01
    Download or request the building permit form.
  2. 02
    Prepare the plot diagram and project description.
  3. 03
    Submit the application with the fee to City Hall.
  4. 04
    Building official / council review occurs under Chapter 155.
  5. 05
    If approved, the permit is issued.
  6. 06
    Certificate of occupancy is issued when the work is complete and approved.

Typical processing time: Not published. Thin data.

Source: Building Permits and Inspections Department ↗

§ 04

Fee schedule

4) Donnellson building permit fees

Fee type
Amount
01
Minimum permit fee
$25.00
02
Plan check fee
Not published. Thin data.
03
Reinspection fee
Not published. Thin data.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Not published. Thin data. (phone)

Typical sequence: Permit application, council/building official approval, construction, certificate of occupancy.

Not published. Thin data.

§ 06

Frequently asked

Common questions about 4) Donnellson permits

01 Do I need a building permit in 4) Donnellson, IA?
No building or other structure may be erected or altered without a permit. The permit form also says permits are required for new homes, additions, patios, decks, porches, garages, accessory buildings, or any work changing outside dimensions of an existing building.
02 How much does a building permit cost in 4) Donnellson, IA?
Building permit fees in 4) Donnellson, IA are set by the local building department and vary by project type and valuation. The minimum permit fee is $25.00. Plan check fee: Not published. Thin data..
03 How do I apply for a building permit in 4) Donnellson, IA?
To apply for a building permit in 4) Donnellson, IA, follow these steps: 1. Download or request the building permit form. 2. Prepare the plot diagram and project description. 3. Submit the application with the fee to City Hall. 4. Building official / council review occurs under Chapter 155. 5. If approved, the permit is issued. 6. Certificate of occupancy is issued when the work is complete and approved.
04 How long does it take to get a building permit in 4) Donnellson, IA?
Building permit processing times in 4) Donnellson, IA typically run Not published. Thin data.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in 4) Donnellson, IA?
Not all construction work requires a permit in 4) Donnellson, IA. The following work is generally exempt: The permit form states a permit is not required for interior remodeling, roofing, window replacement, or siding a building.; The permit form states the construction of a fence does not require a building permit, but the fence still must comply with chapter standards.. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in 4) Donnellson, IA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in 4) Donnellson, IA via: Not published. Thin data..
last verified April 2026 source Building Permits and Inspections Department ↗ entry id permits/iowa/lee/4-donnellson

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Permits and Inspections Department before applying. Jaspector is not legal advice.