jaspector
County building permits

Unincorporated Washington County

How to apply for a building permit in unincorporated Washington County, Indiana. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Washington County Building Department / Washington County Building Commissioner

Street address
601 Anson St, Salem, IN 47167
Coverage
Unincorporated Washington County. County code and county building department materials indicate the county building department handles county-level building permit and inspection functions outside incorporated municipal jurisdictions.
§ 02

When a permit is required

Permit triggers and exempt work for Washington County

County code and county forms indicate permits are required for new dwelling construction, temporary site improvements, manufactured homes, and related building work subject to county inspection.

County code and forms reviewed focus on regulated building work, temporary site improvements, manufactured homes, and inspection-controlled construction stages.
  • Exempt County code and forms reviewed focus on regulated building work, temporary site improvements, manufactured homes, and inspection-controlled construction stages.
Required documents
  • County materials reference the building application, septic permit where applicable, deed or proof of ownership, site plan, and project-specific plans or checklist items.
Building code
The county temporary site improvement application states the current International Residential Code is on file with the Washington County Building Department. County code also references the county building code and inspection authority.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Confirm the project is in unincorporated Washington County and not inside Salem or another incorporated municipality.
  2. 02
    If the project includes septic work, obtain the septic permit first from the Washington County Health Department.
  3. 03
    Use the county building department for the building permit and required inspections / evaluations.
  4. 04
    County materials show a required 24-hour notice for evaluations.
  5. 05
    For manufactured home, framed home, and modular home projects, county checklists require homeowner or general contractor participation at each stage.
§ 04

Fee schedule

Washington County building permit fees

Fee type
Amount
01
Minimum permit fee
$50 for 0 up to 500 square feet.
02
Permit fee formula
County ordinance fee schedule is square-foot based:

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Contact the Washington County Building Department by phone. The public checklist materials require 24-hour notice. (phone)

Typical sequence: County checklists show:

County materials state the homeowner or general contractor should be present for each phase, and a $250 per day fine may apply for failure to call for required evaluations.

§ 06

Frequently asked

Common questions about unincorporated Washington County permits

01 Do I need a building permit in unincorporated Washington County, IN?
County code and county forms indicate permits are required for new dwelling construction, temporary site improvements, manufactured homes, and related building work subject to county inspection.
02 How much does a building permit cost in unincorporated Washington County, IN?
Building permit fees in unincorporated Washington County, IN are set by the local building department and vary by project type and valuation. The minimum permit fee is $50 for 0 up to 500 square feet.. Fees are calculated as: County ordinance fee schedule is square-foot based:.
03 How do I apply for a building permit in unincorporated Washington County, IN?
To apply for a building permit in unincorporated Washington County, IN, follow these steps: 1. Confirm the project is in unincorporated Washington County and not inside Salem or another incorporated municipality. 2. If the project includes septic work, obtain the septic permit first from the Washington County Health Department. 3. Use the county building department for the building permit and required inspections / evaluations. 4. County materials show a required 24-hour notice for evaluations. 5. For manufactured home, framed home, and modular home projects, county checklists require homeowner or general contractor participation at each stage.
04 What work is exempt from building permits in unincorporated Washington County, IN?
Not all construction work requires a permit in unincorporated Washington County, IN. The following work is generally exempt: County code and forms reviewed focus on regulated building work, temporary site improvements, manufactured homes, and inspection-controlled construction stages.. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in unincorporated Washington County, IN?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in unincorporated Washington County, IN via: Contact the Washington County Building Department by phone. The public checklist materials require 24-hour notice..
last verified April 2026 entry id permits/indiana/washington/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Washington County Building Department / Washington County Building Commissioner before applying. Jaspector is not legal advice.