Town of Cedar Grove

How to apply for a building permit in Town of Cedar Grove, Indiana. Permit authority, application steps, fees, and inspection requirements.

Avg processing
5 days
Last verified
April 2026
On this page 6
§ 01

Permit authority

Franklin County Area Plan Commission and Building Department

Street address
1010 Franklin Avenue, Room 107, Brookville, IN 47012
Coverage
Cedar Grove appears to rely on the countywide office; no separate Cedar Grove permit department was found
§ 02

When a permit is required

Permit triggers and exempt work for Cedar Grove

County fee schedule covers single family dwellings, manufactured homes, additions, accessory buildings, pools, decks, commercial work, churches, multi-family, temporary structures, signs, zoning petitions, subdivisions, and variances.

Note: No Cedar Grove-specific exempt-work list was published.

Required documents
  • Two sets of plans
  • Site plan
  • Survey copy if new survey
  • Recorded deed
  • Tax bill ID or parcel number
  • Legal description
  • Septic permit or approval
  • Notice of agriculture activity (when applicable)
Permit validity
Permit good for one year, but work must be started within six months.

Source: Franklin County Area Plan Commission and Building Department ↗

§ 03

Application process

Typical processing: 5 days

  1. 01
    Confirm the project type and pull the correct county application form from the county site.
  2. 02
    For residential homes, gather parcel and legal description information.
  3. 03
    Obtain septic approval from the Health Department or a Brookville Lake Regional Waste District availability letter if applicable.
  4. 04
    Record any Notice of Agriculture Activity in the Recorder's Office before permit issuance, when applicable.
  5. 05
    Prepare and submit two sets of plans, a site plan, and any required survey and deed records.
  6. 06
    Submit the application to the Area Plan Commission and Building Department.
  7. 07
    All permits are subject to a five day review.
  8. 08
    Permit is issued after review and fee payment.

Typical processing time: 5 days

Source: Franklin County Area Plan Commission and Building Department ↗

§ 04

Fee schedule

Cedar Grove building permit fees

Fee type
Amount
01
Minimum permit fee
$30 location improvement permit plus project-specific building inspection fee
02
Permit fee formula
Single family dwelling is $300 plus $5 per 100 sq ft over 960 sq ft, plus $30 location improvement permit
03
Reinspection fee
$45

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

Inspection hours
8:30 AM to 4:00 PM (closed for lunch 12:00 PM to 1:00 PM)

Typical sequence: Residential packet sequence includes: footer, basement floor, plumbing, wall, rough-in framing/electrical/plumbing air test, permanent electrical service, and final inspections unless an inspection fails.

§ 06

Frequently asked

Common questions about Cedar Grove permits

01 Do I need a building permit in Cedar Grove, IN?
County fee schedule covers single family dwellings, manufactured homes, additions, accessory buildings, pools, decks, commercial work, churches, multi-family, temporary structures, signs, zoning petitions, subdivisions, and variances.
02 How much does a building permit cost in Cedar Grove, IN?
Building permit fees in Cedar Grove, IN are set by the local building department and vary by project type and valuation. The minimum permit fee is $30 location improvement permit plus project-specific building inspection fee. Fees are calculated as: Single family dwelling is $300 plus $5 per 100 sq ft over 960 sq ft, plus $30 location improvement permit.
03 How do I apply for a building permit in Cedar Grove, IN?
To apply for a building permit in Cedar Grove, IN, follow these steps: 1. Confirm the project type and pull the correct county application form from the county site. 2. For residential homes, gather parcel and legal description information. 3. Obtain septic approval from the Health Department or a Brookville Lake Regional Waste District availability letter if applicable. 4. Record any Notice of Agriculture Activity in the Recorder's Office before permit issuance, when applicable. 5. Prepare and submit two sets of plans, a site plan, and any required survey and deed records. 6. Submit the application to the Area Plan Commission and Building Department. 7. All permits are subject to a five day review. 8. Permit is issued after review and fee payment.
04 How long does it take to get a building permit in Cedar Grove, IN?
Building permit processing times in Cedar Grove, IN typically run 5 days. Timelines can vary based on project complexity and current department workload.
last verified April 2026 source Franklin County Area Plan Commission and Building Department ↗ entry id permits/indiana/franklin/cedar-grove

Educational reference. Permit rules and fees change — confirm current requirements directly with Franklin County Area Plan Commission and Building Department before applying. Jaspector is not legal advice.