How to apply for a building permit in Brookville, Indiana. Permit authority, application steps, fees, and inspection requirements.

Indiana Franklin County Updated March 2026

Permit Authority

Brookville is within the countywide permit area; no separate Brookville building department was found

Department
Franklin County Area Plan Commission and Building Department
Address
1010 Franklin Avenue, Room 107, Brookville, IN 47012
Phone
765-647-5731

Application Process

  1. Confirm the project type and pull the correct county application form from the county site.
  2. For residential homes, gather parcel and legal description information.
  3. Obtain septic approval from the Health Department or a Brookville Lake Regional Waste District availability letter if applicable.
  4. Record any Notice of Agriculture Activity in the Recorder's Office before permit issuance, when applicable.
  5. Prepare and submit two sets of plans, a site plan, and any required survey and deed records.
  6. Submit the application to the Area Plan Commission and Building Department.
  7. All permits are subject to a five day review.
  8. Permit is issued after review and fee payment.

Typical processing time: 5 days

Source: Franklin County Area Plan Commission and Building Department

General Requirements

County fee schedule covers single family dwellings, manufactured homes, additions, accessory buildings, pools, decks, commercial work, churches, multi-family, temporary structures, signs, zoning petitions, subdivisions, and variances.

Required Documents

  • Two sets of plans
  • Site plan
  • Survey copy if new survey
  • Recorded deed
  • Tax bill ID or parcel number
  • Legal description
  • Septic permit or approval
  • Notice of agriculture activity (when applicable)
Permit validity
Permit good for one year, but work must be started within six months.

Fees

Minimum permit fee
$30 location improvement permit plus project-specific building inspection fee
Permit fee formula
Single family dwelling is $300 plus $5 per 100 sq ft over 960 sq ft, plus $30 location improvement permit
Reinspection fee
$45

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

Contact the Franklin County Area Plan Commission and Building Department to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

Inspection hours
8:30 AM to 4:00 PM (closed for lunch 12:00 PM to 1:00 PM)

Typical inspection sequence: Residential packet sequence includes: footer, basement floor, plumbing, wall, rough-in framing/electrical/plumbing air test, permanent electrical service, and final inspections unless an inspection fails.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Franklin County Area Plan Commission and Building Department before applying.

Frequently Asked Questions

Brookville Building Permit FAQ

Do I need a building permit in Brookville, IN?
County fee schedule covers single family dwellings, manufactured homes, additions, accessory buildings, pools, decks, commercial work, churches, multi-family, temporary structures, signs, zoning petitions, subdivisions, and variances.
How much does a building permit cost in Brookville, IN?
The minimum permit fee is $30 location improvement permit plus project-specific building inspection fee. Fees are calculated as: Single family dwelling is $300 plus $5 per 100 sq ft over 960 sq ft, plus $30 location improvement permit.
How do I apply for a building permit in Brookville, IN?
1. Confirm the project type and pull the correct county application form from the county site. 2. For residential homes, gather parcel and legal description information. 3. Obtain septic approval from the Health Department or a Brookville Lake Regional Waste District availability letter if applicable. 4. Record any Notice of Agriculture Activity in the Recorder's Office before permit issuance, when applicable. 5. Prepare and submit two sets of plans, a site plan, and any required survey and deed records. 6. Submit the application to the Area Plan Commission and Building Department. 7. All permits are subject to a five day review. 8. Permit is issued after review and fee payment.
How long does it take to get a building permit in Brookville, IN?
Typical processing time is 5 days.

Need help with your project?

Navigating permits in Brookville can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.