When a permit is required
Permit triggers and exempt work for Delaware County
Permits are required for new structures (except detached accessory structures under 200 sq ft), additions, demolition, electrical service or panel work, plumbing in new buildings or additions, HVAC new or replacement furnaces/AC/unit heaters/radiant heaters, pools, signs, residential solar panels, and other listed building work in unincorporated Delaware County.
- Exempt Detached accessory structures with floor area smaller than 200 square feet
Note: Work not otherwise listed on the county Required Permits page should be confirmed with the office before starting.
- Permit application
- Plans as required by permit type
- Site staking for site inspection
- Indiana state release (for commercial work)
- Current county registration, insurance, and bond (for contractor-issued permits)
- Building code
- According to county sources: 2006 International Building Code, International Residential Code, International Fire Code, International Electrical Code, International Plumbing Code, and International Mechanical Code as adopted by Indiana (department page); however, a newer Required Inspections PDF states 2018 versions of these codes. Verify current code set with the office.
- Owner-builder
- The property owner is responsible for obtaining required permits, but a contractor currently registered with Delaware County may obtain the permit on the owner's behalf.
- Contractor requirements
- General, electrical, plumbing, and HVAC contractors working in unincorporated Delaware County must register annually and keep insurance and bond current with the office.
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm the project is in unincorporated Delaware County and determine the required permit type from the county Required Permits page.
- 02 Download the applicable permit application from the county permit document center.
- 03 For commercial projects, obtain the required Indiana state release before county permit issuance.
- 04 Submit the application and required plans to the Building Commissioner's Office.
- 05 Stake the proposed structure for the required site inspection before permit approval when applicable.
- 06 Call (765) 747-7799 at least 24 to 48 hours in advance to schedule required inspections; email inspections are not accepted.
- 07 Pass required inspections and obtain final inspection and certificate of occupancy before occupancy.
Fee schedule
Delaware County building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (765) 747-7799 (phone)
- Scheduling deadline
- Call at least 24 to 48 hours in advance; email inspections are not accepted.
- Inspection hours
- Monday through Friday 8:30 a.m. to 4:00 p.m.
Typical sequence: Site inspection before permit approval; post structure footing inspection if applicable; footing; foundation/basement; under slab; framing; temporary or permanent electrical service; rough-ins; final inspection before occupancy and certificate of occupancy.
Frequently asked
Common questions about unincorporated Delaware County permits
01 Do I need a building permit in unincorporated Delaware County, IN? ▸
02 How much does a building permit cost in unincorporated Delaware County, IN? ▸
03 How do I apply for a building permit in unincorporated Delaware County, IN? ▸
04 What work is exempt from building permits in unincorporated Delaware County, IN? ▸
05 How do I schedule a building inspection in unincorporated Delaware County, IN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Delaware County Building Commissioner's Office / DMMPC - Building Commissioner & Zoning Administrator before applying. Jaspector is not legal advice.