When a permit is required
Permit triggers and exempt work for English
A building permit is required before beginning construction, alteration, or repair of any building or structure when the cost exceeds $500.
- Exempt Routine maintenance, repair, or remodeling of existing structures not involving a change in use, additional lot coverage, or increase in size
- Exempt Underground or overhead utility lines, signs, and related appurtenances other than buildings and primary structures erected by a public utility or public agency
- Exempt Lot improvements such as sidewalks, landscaping, play equipment, flag poles, and lawn and garden equipment
- Exempt Structures accessory to an agricultural cultivation or husbandry land use
- Plat or sketch showing lot boundaries
- Plans and specifications showing the work
- State design release for covered construction
- Building code
- Indiana Fire Prevention and Building Safety Commission rules incorporated by reference; Indiana Building Code; Indiana One and Two Family Dwelling Code; Indiana Plumbing Code; Indiana Electrical Code; Indiana Mechanical Code; Indiana Energy Conservation Code; Indiana Swimming Pool Code
- Permit validity
- Improvement location permits must begin within 180 days of issuance and be completed within 1 year or they expire.
Application process
Application → plan check → issuance → inspection → final
- 01 Prepare a plat or sketch of the proposed location showing lot boundaries and plans and specifications showing the work to be done.
- 02 If the project is covered by a state design release, provide the Design Release issued by the State Building Commissioner and State Fire Marshal.
- 03 File the application using forms furnished by the Building Commissioner.
- 04 The Building Commissioner reviews the application for code compliance and flood safety as applicable.
- 05 After approval, the permit is issued.
Source: Town of English Building Commissioner / Zoning Administrator ↗
Fee schedule
English building permit fees
Required inspections
Scheduling and sequence
Typical sequence: Building Commissioner reviews permit applications. Inspections occur after permit issuance as needed for compliance. Fire chief or designee assists for fire suppression, detection, and alarm systems. Certificate of occupancy is required before occupancy.
Frequently asked
Common questions about English permits
01 Do I need a building permit in English, IN? ▸
02 How much does a building permit cost in English, IN? ▸
03 How do I apply for a building permit in English, IN? ▸
04 What work is exempt from building permits in English, IN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of English Building Commissioner / Zoning Administrator before applying. Jaspector is not legal advice.