jaspector
City building permits

Carterville

How to apply for a building permit in Carterville, Illinois. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Building and Zoning

Street address
103 S Division St, Carterville, IL 62918
Coverage
City of Carterville corporate limits
Online portal
Permit portal
PDF/application download and city office contact
§ 02

When a permit is required

Permit triggers and exempt work for Carterville

Required documents
  • application and plans; commercial plans require an architect stamp.
Building code
Carterville site references code compliance and the application PDF references the Illinois Plumbing Code; exact current adopted editions beyond the state baseline were not clearly summarized on the public page.
Owner-builder
only the owner or agent may sign the permit application.
Contractor requirements
plumbing must be done by an Illinois state licensed plumber, with a limited waiver if the person doing the plumbing will reside at the structure for at least one year; electrical work must be by a competent person with at least 50 percent of annual income from electrical work, with a similar residence waiver.
§ 03

Fee schedule

Carterville building permit fees

Fee type
Amount
01
Minimum permit fee
$.10 per square foot of all construction under roof
02
Permit fee formula
$.10 per square foot for all construction under roof, including basements, second stories, outbuildings, garages, carports, and similar construction.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • owner, agent, or contractor is responsible for notifying the codes office when inspections are needed. (contact)
§ 05

Frequently asked

Common questions about Carterville permits

01 How much does a building permit cost in Carterville, IL?
Building permit fees in Carterville, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $.10 per square foot of all construction under roof. Fees are calculated as: $.10 per square foot for all construction under roof, including basements, second stories, outbuildings, garages, carports, and similar construction..
02 How do I schedule a building inspection in Carterville, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Carterville, IL via: owner, agent, or contractor is responsible for notifying the codes office when inspections are needed..
last verified April 2026 source Building and Zoning ↗ entry id permits/illinois/williamson/carterville

Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Zoning before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Williamson County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Williamson County jurisdictions →