jaspector
City building permits

Carterville

How to apply for a building permit in Carterville, Illinois. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Building and Zoning

Street address
103 S Division St, Carterville, IL 62918
Coverage
City of Carterville corporate limits
Online portal
Permit portal
PDF/application download and city office contact
§ 02

When a permit is required

Permit triggers and exempt work for Carterville

Required documents
  • application and plans; commercial plans require an architect stamp.
Building code
Carterville site references code compliance and the application PDF references the Illinois Plumbing Code; exact current adopted editions beyond the state baseline were not clearly summarized on the public page.
Owner-builder
only the owner or agent may sign the permit application.
Contractor requirements
plumbing must be done by an Illinois state licensed plumber, with a limited waiver if the person doing the plumbing will reside at the structure for at least one year; electrical work must be by a competent person with at least 50 percent of annual income from electrical work, with a similar residence waiver.
§ 03

Fee schedule

Carterville building permit fees

Fee type
Amount
01
Minimum permit fee
$.10 per square foot of all construction under roof
02
Permit fee formula
$.10 per square foot for all construction under roof, including basements, second stories, outbuildings, garages, carports, and similar construction.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • owner, agent, or contractor is responsible for notifying the codes office when inspections are needed. (contact)
§ 05

Frequently asked

Common questions about Carterville permits

01 How much does a building permit cost in Carterville, IL? ▸
Building permit fees in Carterville, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $.10 per square foot of all construction under roof. Fees are calculated as: $.10 per square foot for all construction under roof, including basements, second stories, outbuildings, garages, carports, and similar construction..
02 How do I schedule a building inspection in Carterville, IL? ▸
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Carterville, IL via: owner, agent, or contractor is responsible for notifying the codes office when inspections are needed..
last verified April 2026 source Building and Zoning ↗ entry id permits/illinois/williamson/carterville

Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Zoning before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Williamson County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Williamson County jurisdictions →