When a permit is required
Permit triggers and exempt work for Washington County
Before beginning any construction. The county zoning page states all construction requires a building permit, including agricultural buildings.
- Exempt Agricultural buildings and structures, as defined by Section 4-13 of the zoning code, are fee-exempt.
- Exempt Structures under 150 square feet have a $0 filing fee.
- Application form, legal description, E-911 address or parcel number, site plan with property line and setback measurements, and any additional supporting sheets.
- Building code
- County zoning materials reference state and local law, but do not publish a separate county building code edition on the zoning page. For 2025 state minimums, use IBC 2021, IRC 2021, NEC 2023, Illinois Energy Conservation Code, and Illinois Plumbing Code.
- Contractor requirements
- No local contractor registration rule found in public county sources. Illinois state licensing still applies to electricians and plumbers through IDFPR.
Application process
Typical processing: "within a few days" if zoning compliant.
- 01 Confirm zoning compliance with the county zoning office.
- 02 Submit the building permit application with a legal description, E-911 address or parcel number, and a site plan showing measurements from property lines and other buildings.
- 03 If the project meets zoning requirements, the county states the permit is issued within a few days.
- 04 If the proposal does not comply, the applicant may seek an interpretation, variance, zoning amendment, or special use permit as applicable.
Typical processing time: "within a few days" if zoning compliant.
Fee schedule
Washington County building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Call the zoning office for an appointment; the county application says applicants are encouraged to visit the office and (online)
- Inspection hours
- Zoning office hours shown on the county site are Tuesday by appointment only and Thursday 10:00 am to 2:00 pm.
Typical sequence: Zoning review first, then permit issuance, then any required county or state inspections during construction.
Frequently asked
Common questions about unincorporated Washington County permits
01 Do I need a building permit in unincorporated Washington County, IL? ▸
02 How much does a building permit cost in unincorporated Washington County, IL? ▸
03 How do I apply for a building permit in unincorporated Washington County, IL? ▸
04 How long does it take to get a building permit in unincorporated Washington County, IL? ▸
05 What work is exempt from building permits in unincorporated Washington County, IL? ▸
06 How do I schedule a building inspection in unincorporated Washington County, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Washington County Zoning Office before applying. Jaspector is not legal advice.