jaspector
City building permits

City of Delavan

How to apply for a building permit in City of Delavan, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2018 IBC/IRC, 2017 NEC, Illinois Plumbing Code.
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Delavan / Tazewell County Community Development

Street address
City Hall, Delavan, IL 61734
Coverage
Shared jurisdiction; verify if within city limits or unincorporated via City Clerk.
Online portal
City of Delavan
Manual/PDF-based
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Delavan

New construction, additions, structural alterations, decks, garages, HVAC/Elec/Plumb replacements, and demolition.

Minor repairs
  • Exempt Minor repairs
Required documents
  • Application
  • Site plan
  • Construction plans
Building code
2018 IBC/IRC, 2017 NEC, Illinois Plumbing Code.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Contact Delavan City Hall to verify jurisdiction.
  2. 02
    If in City limits, follow City Clerk instructions for forms.
  3. 03
    If unincorporated, follow Tazewell County Community Development process.

Source: City of Delavan / Tazewell County Community Development ↗

§ 04

Fee schedule

Delavan building permit fees

Fee type
Amount
01
Plan check fee
May require cash deposit ($400 for large projects).
02
Permit fee formula
Valuation or square footage based.
03
Reinspection fee
Fees doubled for work without permit.
04
Penalty (no permit)
Fees doubled for work without permit.

Payment at City Hall.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • City Hall (309) 244-7146 or County (309) 477-2235 (phone)
Scheduling deadline
48-hour advance notice required.
Inspection hours
Monday - Friday

Typical sequence: Footing, Rough-in, Final.

§ 06

Frequently asked

Common questions about Delavan permits

01 Do I need a building permit in Delavan, IL?
New construction, additions, structural alterations, decks, garages, HVAC/Elec/Plumb replacements, and demolition.
02 How much does a building permit cost in Delavan, IL?
Building permit fees in Delavan, IL are set by the local building department and vary by project type and valuation. Fees are calculated as: Valuation or square footage based.. Plan check fee: May require cash deposit ($400 for large projects)..
03 How do I apply for a building permit in Delavan, IL?
To apply for a building permit in Delavan, IL, follow these steps: 1. Contact Delavan City Hall to verify jurisdiction. 2. If in City limits, follow City Clerk instructions for forms. 3. If unincorporated, follow Tazewell County Community Development process.
04 What work is exempt from building permits in Delavan, IL?
Not all construction work requires a permit in Delavan, IL. The following work is generally exempt: Minor repairs. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Delavan, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Delavan, IL via: City Hall (309) 244-7146 or County (309) 477-2235. 48-hour advance notice required..
last verified April 2026 source City of Delavan / Tazewell County Community Development ↗ entry id permits/illinois/tazewell/delavan

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Delavan / Tazewell County Community Development before applying. Jaspector is not legal advice.