City building permits

Village of Matherville

How to apply for a building permit in Village of Matherville, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2021 IRC/IBC (State mandate).
Avg processing
5-10 business days.
Min. permit fee
$25.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

Village of Matherville Village Hall

Street address
310 S 4th St, Matherville, IL 61263
Coverage
Village of Matherville limits.
Online portal
Village of Matherville Forms
Manual
§ 02

When a permit is required

Permit triggers and exempt work for Matherville

New buildings, additions, fences, and utility connections.

Cosmetic updates
General maintenance
  • Exempt Cosmetic updates
  • Exempt General maintenance
Required documents
  • Application
  • Site plan
Building code
2021 IRC/IBC (State mandate).
Permit validity
1 year.
Owner-builder
Allowed.
Contractor requirements
State licenses for plumbing/roofing.
§ 03

Application process

Typical processing: 5-10 business days.

  1. 01
    Visit Village Hall to obtain building/zoning application.
  2. 02
    Submit application with project details.
  3. 03
    Review by Village Manager (Stephanie McMeekan) or Clerk.
  4. 04
    Approval and fee payment.

Typical processing time: 5-10 business days.

Source: Village of Matherville Village Hall ↗

§ 04

Fee schedule

Matherville building permit fees

Fee type
Amount
01
Minimum permit fee
$25.00
02
Permit fee formula
Flat fees for most residential improvements.

Cash or check at Village Hall.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Call Village Hall at (309) 754-8814 (phone)
Inspection hours
By appointment

Typical sequence: Final inspection.

§ 06

Frequently asked

Common questions about Matherville permits

01 Do I need a building permit in Matherville, IL? ▸
New buildings, additions, fences, and utility connections.
02 How much does a building permit cost in Matherville, IL? ▸
Building permit fees in Matherville, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $25.00. Fees are calculated as: Flat fees for most residential improvements..
03 How do I apply for a building permit in Matherville, IL? ▸
To apply for a building permit in Matherville, IL, follow these steps: 1. Visit Village Hall to obtain building/zoning application. 2. Submit application with project details. 3. Review by Village Manager (Stephanie McMeekan) or Clerk. 4. Approval and fee payment.
04 How long does it take to get a building permit in Matherville, IL? ▸
Building permit processing times in Matherville, IL typically run 5-10 business days.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Matherville, IL? ▸
Not all construction work requires a permit in Matherville, IL. The following work is generally exempt: Cosmetic updates; General maintenance. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Matherville, IL? ▸
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Matherville, IL via: Call Village Hall at (309) 754-8814.
last verified April 2026 source Village of Matherville Village Hall ↗ entry id permits/illinois/mercer/matherville

Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Matherville Village Hall before applying. Jaspector is not legal advice.