§ 01

Permit authority

Building & Zoning Department

Street address
7401 Meyer Road, Spring Grove, IL 60081
Coverage
Serves incorporated Village of Spring Grove.
Online portal
Village of Spring Grove
In-house / PDF forms
§ 02

When a permit is required

Permit triggers and exempt work for Spring Grove

New construction, accessory structures, structural changes, plumbing/elec, roofs, siding, pools.

Minor cosmetic repairs
Landscaping not affecting drainage
  • Exempt Minor cosmetic repairs
  • Exempt Landscaping not affecting drainage

Note: Confirm specific exemptions with Building & Zoning Department.

Required documents
  • Application
  • Plans
  • Site plan (showing silt fence)
  • Contractor registration
Building code
2021 International Codes, 2020 NEC, 2014 IL Plumbing, 2021 NFPA 101.
Owner-builder
Owner-builders allowed for primary residence.
Contractor requirements
Must register with Village ($100 annual fee).

Source: Building & Zoning Department ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Submit application with estimated cost, sq ft, and contractor details.
  2. 02
    Provide three sets of physical drawings and one electronic copy.
  3. 03
    Reviews by Building, Health (Septic), and HOA/ARC if applicable.
  4. 04
    Pay fees and pick up permit.

Source: Building & Zoning Department ↗

§ 04

Fee schedule

Spring Grove building permit fees

Fee type
Amount
01
Minimum permit fee
$150 (Decks); $65 (Fences/Driveways)
02
Permit fee formula
$1.15 per sq ft for new residential.
03
Trade permit fee
$150 base
04
Reinspection fee
$100.00

Cash bonds ($500-$1,000) typically required.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (815) 675-2121 (phone)
Inspection hours
Mon, Wed, Fri (Building); Mon-Fri (Plumbing).
Time windows
Mon, Wed, Fri (Building); Mon-Fri (Plumbing)

Typical sequence: Typical sequence: Foundation, Rough, Final.

Source: Building & Zoning Department ↗

§ 06

Frequently asked

Common questions about Spring Grove permits

01 Do I need a building permit in Spring Grove, IL?
New construction, accessory structures, structural changes, plumbing/elec, roofs, siding, pools.
02 How much does a building permit cost in Spring Grove, IL?
Building permit fees in Spring Grove, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $150 (Decks); $65 (Fences/Driveways). Fees are calculated as: $1.15 per sq ft for new residential..
03 How do I apply for a building permit in Spring Grove, IL?
To apply for a building permit in Spring Grove, IL, follow these steps: 1. Submit application with estimated cost, sq ft, and contractor details. 2. Provide three sets of physical drawings and one electronic copy. 3. Reviews by Building, Health (Septic), and HOA/ARC if applicable. 4. Pay fees and pick up permit.
04 What work is exempt from building permits in Spring Grove, IL?
Not all construction work requires a permit in Spring Grove, IL. The following work is generally exempt: Minor cosmetic repairs; Landscaping not affecting drainage. Note: Confirm specific exemptions with Building & Zoning Department. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Spring Grove, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Spring Grove, IL via: (815) 675-2121.
last verified April 2026 source Building & Zoning Department ↗ entry id permits/illinois/mchenry/spring-grove

Educational reference. Permit rules and fees change — confirm current requirements directly with Building & Zoning Department before applying. Jaspector is not legal advice.