When a permit is required
Permit triggers and exempt work for Metropolis
A building permit is required before beginning any construction, addition, alteration, demolition, or change of occupancy of a building or structure within the city.
- Exempt Fences and walls at or below 6 feet in height (above average grade)
- Exempt Ordinary repair and maintenance work that does not involve structural changes
- Exempt Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work
- Exempt Prefabricated swimming pools less than 24 inches deep
- Exempt Portable heating, ventilation, or cooling equipment
- Exempt Window awnings supported by an exterior wall and not projecting more than 54 inches
Note: The city's FAQ and code were not fully accessible via web scraping. Contact the department at 618-524-3411 or review the complete FAQ for the authoritative local exemption list.
- Completed permit application form
- Site/plot plan showing property lines and structure locations
- Construction plans or drawings
- Cash bond or corporate surety bond (per municipal ordinance Chapter 150)
- Building code
- Effective January 1, 2025, Metropolis enforces minimum standards based on IBC 2021, IRC 2021, IEBC 2021, NEC 2023, Illinois Energy Conservation Code, Illinois Accessibility Code, and Illinois Plumbing Code. Chapter 150 (Building Regulations) and Chapter 156 (Zoning) govern local requirements. Municipal code is current through Ordinance 2024-31.
- Owner-builder
- Not specifically published. Contact the department.
- Contractor requirements
- Illinois does not have a statewide general contractor license. Electricians must hold a license from a qualifying Illinois municipality based on the NEC. Plumbers must hold a valid Illinois state plumbing license. Confirm any local contractor registration requirements directly with the Building and Zoning Department.
Source: Building and Zoning Department ↗
Application process
Application → plan check → issuance → inspection → final
- 01 Determine whether your project requires a permit by consulting the Building and Zoning FAQ or contacting Chad Murray at 618-524-3411.
- 02 Obtain the permit application from the city website forms page or in person at 106 West 5th Street.
- 03 Prepare required documents: completed application, site/plot plan, construction drawings, and a cash bond or corporate surety bond approved by City Council.
- 04 Submit application and documents in person to the Building and Zoning Department.
- 05 Department reviews plans for compliance with building codes, zoning regulations, and applicable ordinances.
- 06 Pay permit fees upon approval.
- 07 Permit is issued; post permit on site.
- 08 Schedule inspections at required stages during construction.
- 09 Request final inspection upon project completion.
- 10 Certificate of occupancy or completion issued after passing final inspection.
Source: Building and Zoning Department ↗
Required inspections
Scheduling and sequence
- 618-524-3175 (phone)
- cmurray@metropolisil.gov (email)
- Inspection hours
- City Hall utility/clerk office hours: Monday-Friday 7:30 AM - 3:30 PM. Building and Zoning office hours likely similar — call 618-524-3175 to confirm.
Typical sequence: Typical sequence: footing/foundation inspection (before concrete pour), framing inspection (after rough framing and MEP), insulation inspection (if applicable), final inspection (upon completion). Additional stage inspections may be required depending on project type.
Frequently asked
Common questions about Metropolis permits
01 Do I need a building permit in Metropolis, IL? ▸
02 How do I apply for a building permit in Metropolis, IL? ▸
03 What work is exempt from building permits in Metropolis, IL? ▸
04 How do I schedule a building inspection in Metropolis, IL? ▸