On this page 6
When a permit is required
Permit triggers and exempt work for Havana
roofing projects, footprint changes, structures over 100 sq. ft., fences, decks, patios, pergolas, and other listed work.
- Exempt Concrete pads and driveways are not included in the permit process, though runoff rules still apply
- completed application, site sketch, project details, contractor and license info where relevant, and stamped prints for C-1 and above new construction.
- Building code
- Havana states it adopted the 2018 edition of the International Building Code, 2011 NEC, Life Safety Code 2001, IECC, and Illinois Accessibility Code 2018 on the zoning page; the permit form also references the 2020 ICC edition. The public pages conflict, so this should be verified directly with the city before design work.
- Owner-builder
- form allows owner applicant; no separate public owner-builder policy found.
- Contractor requirements
- roofing or plumbing license required on the form where applicable; the form also asks for insurance policy information for roofing and plumbing work.
Application process
Application → plan check → issuance → inspection → final
- 01 Determine whether the project is one of the listed permit triggers.
- 02 Complete the building permit application PDF.
- 03 Include site drawing, setbacks, project description, and for new construction in C-1 and above, stamped prints.
- 04 Submit electronically or print and contact zoning.
- 05 Property must be inspected by the zoning officer before issuance.
- 06 Follow up after electronic submission if requested.
Source: Havana Zoning Department ↗
Fee schedule
Havana building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- contact zoning department by phone or email to make an appointment for inspection and approval (online)
- Inspection hours
- city hall hours are not clearly listed on the zoning page; general site shows city administration contact during normal business hours
Typical sequence: application, property inspection, then permit issuance
Frequently asked
Common questions about Havana permits
01 Do I need a building permit in Havana, IL? ▸
02 How much does a building permit cost in Havana, IL? ▸
03 How do I apply for a building permit in Havana, IL? ▸
04 What work is exempt from building permits in Havana, IL? ▸
05 How do I schedule a building inspection in Havana, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Havana Zoning Department before applying. Jaspector is not legal advice.