jaspector
§ IL Lake County
City building permits

Village of Round Lake Beach

How to apply for a building permit in Village of Round Lake Beach, Illinois. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
~$50 for decks
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department

Street address
1937 N. Municipal Way, Round Lake Beach, IL 60073
Coverage
All properties within the incorporated Village of Round Lake Beach.
Online portal
Village Hall / Online Forms
Online/In-Person
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Round Lake Beach

New construction, additions, decks, fences, driveways, patios, pools, sheds, and major interior remodeling

Minor cosmetic repairs
Routine maintenance
  • Exempt Minor cosmetic repairs
  • Exempt Routine maintenance

Note: Verify exemptions with the Building Department

Required documents
  • Completed application
  • Site plans
  • Structural drawings
  • Contractor registration information
Building code
Transitioning to 2021/2024 International Codes to comply with PA 103-0510. Enforces Illinois Plumbing and Accessibility codes. Codes in effect on Jan 1 of the application year remain governing for the permit's duration
Permit validity
90 days from issuance (one 90-day extension allowed)
Contractor requirements
Contractors must be registered annually and provide proof of insurance and licensing

Source: Building Department ↗

§ 03

Application process

Typical processing: 24-48 hours for simple projects; 7-10 days for complex projects

  1. 01
    Submit application with site plans and structural drawings
  2. 02
    Review time for simple projects (fences/decks) is 24-48 hours; complex projects 7-10 days
  3. 03
    Contractors must be registered annually and provide proof of insurance and licensing
  4. 04
    Plan review conducted to ensure compliance with IBC/IRC/NEC
  5. 05
    Pay fees and receive permit
  6. 06
    Permit is valid for 90 days (one 90-day extension allowed)

Typical processing time: 24-48 hours for simple projects; 7-10 days for complex projects

Source: Building Department ↗

§ 04

Fee schedule

Round Lake Beach building permit fees

Fee type
Amount
01
Minimum permit fee
~$50 for decks
02
Permit fee formula
~$2,500 for new single-family homes (verify current rates)

Registration fees apply for contractors

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (847) 546-2351 (phone)
Scheduling deadline
Call 48 business hours in advance
Inspection hours
Standard business hours

Typical sequence: Mandatory inspections at various stages

Source: Building Department ↗

§ 06

Frequently asked

Common questions about Round Lake Beach permits

01 Do I need a building permit in Round Lake Beach, IL? ▸
New construction, additions, decks, fences, driveways, patios, pools, sheds, and major interior remodeling
02 How much does a building permit cost in Round Lake Beach, IL? ▸
Building permit fees in Round Lake Beach, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is ~$50 for decks. Fees are calculated as: ~$2,500 for new single-family homes (verify current rates).
03 How do I apply for a building permit in Round Lake Beach, IL? ▸
To apply for a building permit in Round Lake Beach, IL, follow these steps: 1. Submit application with site plans and structural drawings 2. Review time for simple projects (fences/decks) is 24-48 hours; complex projects 7-10 days 3. Contractors must be registered annually and provide proof of insurance and licensing 4. Plan review conducted to ensure compliance with IBC/IRC/NEC 5. Pay fees and receive permit 6. Permit is valid for 90 days (one 90-day extension allowed)
04 How long does it take to get a building permit in Round Lake Beach, IL? ▸
Building permit processing times in Round Lake Beach, IL typically run 24-48 hours for simple projects; 7-10 days for complex projects. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Round Lake Beach, IL? ▸
Not all construction work requires a permit in Round Lake Beach, IL. The following work is generally exempt: Minor cosmetic repairs; Routine maintenance. Note: Verify exemptions with the Building Department When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Round Lake Beach, IL? ▸
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Round Lake Beach, IL via: (847) 546-2351. Call 48 business hours in advance.
last verified April 2026 source Building Department ↗ entry id permits/illinois/lake/round-lake-beach

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.