On this page 6
When a permit is required
Permit triggers and exempt work for Mt. Vernon
Mount Vernon says permits are required for carports, garages, pools, storage buildings, new houses, porches and decks over 30 inches high or with a roof, mobile homes, and new commercial construction, among other work.
Note: Mt. Vernon says many small repairs do not need a building permit. The page does not publish a complete exempt-work list.
- Project cost
- Job address
- Parcel number
- Legal description
- Owner contact info
- Architect
- Contractor
- Electrician
- Plumber
- Roofer
- Use and occupancy class
- Type of construction
- Area in square feet
- Electric service size
- Plans and specifications for public-purpose buildings, including plot plan, approved by an Illinois-licensed architect or structural engineer
- Building code
- City of Mt. Vernon Building Codes page lists IBC 2021, IEBC 2021, IMC 2021, IFGC 2021, IFC 2021, NEC 2023, NFPA 101 2021, Illinois Energy Conservation Code, Illinois Plumbing Code, and Illinois Accessibility Code/ADA.
- Contractor requirements
- The form collects contractor and trade contractor information; the city requires applicable state licensing for architects/engineers on public-purpose projects. The city code page also lists the city electrical contractor license page.
Application process
Application → plan check → issuance → inspection → final
- 01 Complete the building permit application online, by email, or in person.
- 02 Engineering and Inspections Department reviews the application.
- 03 Planning and Zoning Committee reviews it.
- 04 City Council reviews it.
- 05 If approved, the building permit is issued.
Fee schedule
Mt. Vernon building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (618) 242-6830 at least 48 hours before the inspection (phone)
- Scheduling deadline
- Call at least 48 hours before the inspection. Permit holder or owner is responsible for scheduling.
- Inspection hours
- Monday through Friday, 8 a.m. to 5 p.m.
Typical sequence: Concrete/structural rough, electrical rough and final, framing rough, HVAC rough and final, roofing photo review, siding/house wrap, solar panels, and final inspection before occupancy.
Frequently asked
Common questions about Mt. Vernon permits
01 Do I need a building permit in Mt. Vernon, IL? ▸
02 How much does a building permit cost in Mt. Vernon, IL? ▸
03 How do I apply for a building permit in Mt. Vernon, IL? ▸
04 How do I schedule a building inspection in Mt. Vernon, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Engineering and Inspections Administration before applying. Jaspector is not legal advice.