When a permit is required
Permit triggers and exempt work for Vandalia
The city says permits are required for certain building projects to protect residents and property.
- Site drawing
- Setback measurements
- Footing and foundation drawings
- Project details
- Contracting company information
- Roofing license number
- Plumbing contractor and plumbing license number
- Electrical contractor information
- Building code
- The application form cites the 2015 IBC; state minimum code requirements now apply as of January 1, 2025, so statewide 2021 minimum standards apply unless amended locally.
- Contractor requirements
- Application asks for contracting company, roofing license number, plumbing contractor and plumbing license number, and electrical contractor information.
Application process
Application → plan check → issuance → inspection → final
- 01 Download the blank building permit application.
- 02 Prepare a parcel drawing showing existing structures, the new structure, setback measurements, streets, and water meter location.
- 03 Include footing and foundation drawings with dimensions.
- 04 For commercial and industrial construction, provide plans and specifications signed and sealed by an Illinois registered design professional.
- 05 Bring the completed package to 431 W. Gallatin St. or email it to the Building Official.
- 06 Building Official review and inspection follow before approval.
Source: Building and Zoning ↗
Required inspections
Scheduling and sequence
- (618) 283-1152 (phone)
Frequently asked
Common questions about Vandalia permits
01 Do I need a building permit in Vandalia, IL? ▸
02 How do I apply for a building permit in Vandalia, IL? ▸
03 How do I schedule a building inspection in Vandalia, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Zoning before applying. Jaspector is not legal advice.