jaspector
§ IL Cook County
City building permits

Town of Cicero

How to apply for a building permit in Town of Cicero, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Aligning with 2021 IBC/IRC per PA 103-0510.
Avg processing
1-2 weeks.
Min. permit fee
$55
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department

Street address
4949 West Cermak Road, Cicero, IL 60804
Coverage
Town of Cicero.
Online portal
Town of Cicero Building Department
Email/In-person
§ 02

When a permit is required

Permit triggers and exempt work for Cicero

All structural, plumbing, electrical, roofing, and fencing.

Painting.
Glass pane replacement.
Flooring (carpet/wood).
Door replacement in existing opening.
  • Exempt Painting.
  • Exempt Glass pane replacement.
  • Exempt Flooring (carpet/wood).
  • Exempt Door replacement in existing opening.
Required documents
  • Notarized affidavit
  • Contract
  • Plans (if structural)
Building code
Aligning with 2021 IBC/IRC per PA 103-0510.
Permit validity
Generally 6 months.
Owner-builder
$1,500 annual fee waiver for homeowners doing own work (must still apply).
Contractor requirements
Contractors must be licensed with the Town and bonded.
§ 03

Application process

Typical processing: 1-2 weeks.

  1. 01
    Obtain application form from Building Department.
  2. 02
    Submit completed application with notarized affidavit.
  3. 03
    Submit copy of contract for valuation verification.
  4. 04
    Departmental review.
  5. 05
    Pay fees at Town Hall.
  6. 06
    Pick up permit.

Typical processing time: 1-2 weeks.

Source: Building Department ↗

§ 04

Fee schedule

Effective 2025

Fee type
Amount
01
Minimum permit fee
$55
02
Permit fee formula
2% for residential; 3% for commercial.
03
Reinspection fee
$50-$100

Cash, check, or credit card at Town Hall.

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2025) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 708-656-3600 (phone)
Inspection hours
Monday-Friday

Typical sequence: Rough -> Final.

§ 06

Frequently asked

Common questions about Cicero permits

01 Do I need a building permit in Cicero, IL?
All structural, plumbing, electrical, roofing, and fencing.
02 How much does a building permit cost in Cicero, IL?
Building permit fees in Cicero, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $55. Fees are calculated as: 2% for residential; 3% for commercial..
03 How do I apply for a building permit in Cicero, IL?
To apply for a building permit in Cicero, IL, follow these steps: 1. Obtain application form from Building Department. 2. Submit completed application with notarized affidavit. 3. Submit copy of contract for valuation verification. 4. Departmental review. 5. Pay fees at Town Hall. 6. Pick up permit.
04 How long does it take to get a building permit in Cicero, IL?
Building permit processing times in Cicero, IL typically run 1-2 weeks.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Cicero, IL?
Not all construction work requires a permit in Cicero, IL. The following work is generally exempt: Painting.; Glass pane replacement.; Flooring (carpet/wood).; Door replacement in existing opening.. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Cicero, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Cicero, IL via: 708-656-3600.
last verified April 2026 source Building Department ↗ entry id permits/illinois/cook/cicero

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.