Village of Bartelso

How to apply for a building permit in Village of Bartelso, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
IBC/IRC via State mandate.
Min. permit fee
$60.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

Clinton County Zoning Department

Street address
850 Fairfax Street, Room 124, Carlyle, IL 62231
Coverage
The Village of Bartelso contracts with the County for zoning and building.
§ 02

When a permit is required

Permit triggers and exempt work for Bartelso

Same as Unincorporated Clinton County (new homes, mobile homes, additions, decks, sheds, pools, garages, carports, and farm structures).

Maintenance like roofing/siding (without structural change).
  • Exempt Maintenance like roofing/siding (without structural change).
Required documents
  • Completed application
  • Site plan (drawing of lot and structure locations)
  • Floor plan (for dwellings)
  • Sewage permit
Building code
IBC/IRC via State mandate.
Permit validity
1 year.
Owner-builder
Owner-builders are allowed.
Contractor requirements
State licenses required for plumbing/roofing.

Source: Clinton County Zoning Department ↗

§ 03

Application process

Typical processing: 1-5 business days for standard certificates (see County listing).

  1. 01
    Follow Clinton County Zoning application steps.
  2. 02
    Submit all materials to the County Zoning Department in Carlyle.

Typical processing time: 1-5 business days for standard certificates (see County listing).

Source: Clinton County Zoning Department ↗

§ 04

Fee schedule

Bartelso building permit fees

Fee type
Amount
01
Minimum permit fee
$60.00
02
Permit fee formula
Square footage based (e.g., $150 for 501-2000 sq. ft.).
03
Penalty (no permit)
Double fee for late filing.

Paid to Clinton County.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (618) 594-6655 (phone)
Inspection hours
Monday-Friday, 8:00 AM - 4:30 PM

Typical sequence: Typical sequence: Stake-out, Final.

Source: Clinton County Zoning Department ↗

§ 06

Frequently asked

Common questions about Bartelso permits

01 Do I need a building permit in Bartelso, IL?
Same as Unincorporated Clinton County (new homes, mobile homes, additions, decks, sheds, pools, garages, carports, and farm structures).
02 How much does a building permit cost in Bartelso, IL?
Building permit fees in Bartelso, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $60.00. Fees are calculated as: Square footage based (e.g., $150 for 501-2000 sq. ft.)..
03 How do I apply for a building permit in Bartelso, IL?
To apply for a building permit in Bartelso, IL, follow these steps: 1. Follow Clinton County Zoning application steps. 2. Submit all materials to the County Zoning Department in Carlyle.
04 How long does it take to get a building permit in Bartelso, IL?
Building permit processing times in Bartelso, IL typically run 1-5 business days for standard certificates (see County listing).. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Bartelso, IL?
Not all construction work requires a permit in Bartelso, IL. The following work is generally exempt: Maintenance like roofing/siding (without structural change).. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Bartelso, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Bartelso, IL via: (618) 594-6655.
last verified April 2026 source Clinton County Zoning Department ↗ entry id permits/illinois/clinton/bartelso

Educational reference. Permit rules and fees change — confirm current requirements directly with Clinton County Zoning Department before applying. Jaspector is not legal advice.