jaspector
City building permits

Village of Savoy

How to apply for a building permit in Village of Savoy, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Transitioning to 2024 ICC Series and 2023 NEC.
Avg processing
5 to 10 business days.
Min. permit fee
~$75.00 for small projects
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Safety Division, Community and Economic Development (CED) Department

Street address
611 N. Dunlap Avenue, Savoy, IL 61874
Coverage
Village limits of Savoy, IL.
Online portal
Document Center (PDF Forms)
Paper-Based with Online Payment
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Savoy

New structures, foundations, additions, structural changes, most MEP work.

Minor repairs, painting, carpeting
Small sheds (<120 sq. ft. without utilities) - but may still require Zoning Use Permit
  • Exempt Minor repairs, painting, carpeting
  • Exempt Small sheds (<120 sq. ft. without utilities) - but may still require Zoning Use Permit

Note: Confirm exempt work status with CED Department before proceeding.

Required documents
  • Application
  • Site plans
  • Plat of survey by registered surveyor (for foundations/new structures)
Building code
Transitioning to 2024 ICC Series and 2023 NEC.
Permit validity
Generally valid for 12 months.
Owner-builder
Standard provisions apply; must meet code.
Contractor requirements
State license for plumbing/roofing; others must have Village Business License ($128).

Source: Building Safety Division, Community and Economic Development (CED) Department ↗

§ 03

Application process

Typical processing: 5 to 10 business days.

  1. 01
    Download application from Document Center.
  2. 02
    Submit completed application and plans via email or in person.
  3. 03
    CED staff reviews for code and Unified Development Ordinance (UDO) compliance.
  4. 04
    Fees are calculated and applicant is notified.
  5. 05
    Permit issued upon payment.
  6. 06
    Schedule inspections.

Typical processing time: 5 to 10 business days.

Source: Building Safety Division, Community and Economic Development (CED) Department ↗

§ 04

Fee schedule

Savoy building permit fees

Fee type
Amount
01
Minimum permit fee
~$75.00 for small projects
02
Plan check fee
65% of the Building Permit Fee.
03
Permit fee formula
Based on project valuation.
04
Trade permit fee
Included in permit fee structure
05
Reinspection fee
Fees apply for missed/failed inspections.
06
Penalty (no permit)
Fees apply for work without permit

Online via GovPayNow or in-person.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 217-359-5894 (phone)
Scheduling deadline
At least 24 hours in advance.
Inspection hours
Monday-Friday, 8:00 AM - 4:30 PM
Time windows
Standard business hours.

Typical sequence: Typical sequence: Footing, Underground, Rough-ins, Insulation, Final.

Source: Building Safety Division, Community and Economic Development (CED) Department ↗

§ 06

Frequently asked

Common questions about Savoy permits

01 Do I need a building permit in Savoy, IL?
New structures, foundations, additions, structural changes, most MEP work.
02 How much does a building permit cost in Savoy, IL?
Building permit fees in Savoy, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is ~$75.00 for small projects. Fees are calculated as: Based on project valuation.. Plan check fee: 65% of the Building Permit Fee..
03 How do I apply for a building permit in Savoy, IL?
To apply for a building permit in Savoy, IL, follow these steps: 1. Download application from Document Center. 2. Submit completed application and plans via email or in person. 3. CED staff reviews for code and Unified Development Ordinance (UDO) compliance. 4. Fees are calculated and applicant is notified. 5. Permit issued upon payment. 6. Schedule inspections.
04 How long does it take to get a building permit in Savoy, IL?
Building permit processing times in Savoy, IL typically run 5 to 10 business days.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Savoy, IL?
Not all construction work requires a permit in Savoy, IL. The following work is generally exempt: Minor repairs, painting, carpeting; Small sheds (<120 sq. ft. without utilities) - but may still require Zoning Use Permit. Note: Confirm exempt work status with CED Department before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Savoy, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Savoy, IL via: 217-359-5894. At least 24 hours in advance..
last verified April 2026 source Building Safety Division, Community and Economic Development (CED) Department ↗ entry id permits/illinois/champaign/savoy

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Safety Division, Community and Economic Development (CED) Department before applying. Jaspector is not legal advice.