City Building Permits
Donnelly, ID - 2026 Building Permit Guide
How to apply for a building permit in Donnelly, Idaho. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated City of Donnelly. State of Idaho requires separate permits for electrical, plumbing, and HVAC installations.
- Department
- City of Donnelly
- Address
- 169 Halferty Street, PO Box 725, Donnelly, ID 83615
Online Permit Portal
Platform: • Account required: No • Submission: In-person only
Additional resources:
Application Process
- Contact City of Donnelly to coordinate submission and permit requirements.
- Prepare two sets of plans (18" × 24" or 24" × 36") stamped by a licensed architect or engineer certified to comply with 2018 International Codes and City of Donnelly Ordinances.
- Prepare two sets of structural calculations on 8.5" × 11" paper stamped by a licensed engineer.
- Prepare two sets of to-scale site plans showing dwelling site, well site, septic site, and replacement septic site.
- Submit application, plans, and site plans to City of Donnelly.
- City staff reviews for code compliance.
- Pay applicable permit and plan review fees, plus impact fees.
- Obtain permit and proceed with construction.
- Submit electrical, plumbing, and HVAC permits to State of Idaho (DOPL) separately.
Typical processing time: Approximately 2–8 weeks, depending on workload. May–October typically very busy.
Source: City of Donnelly
General Requirements
A building permit is required to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure.
Required Documents
- Building permit application
- Two sets of plans (18" × 24" or 24" × 36") stamped by licensed architect or engineer
- Two sets of structural calculations (8.5" × 11") stamped by licensed engineer
- Two sets of to-scale site plans showing dwelling site, well site, septic site, and replacement septic site
- Building code
- 2018 International Building Code (IBC), 2018 International Energy Conservation Code (IECC)
- Contractor requirements
- Contractors engaged in projects valued at $2,000 or more must be registered with the State of Idaho.
Fees
- Payment note
- Impact Fees (collected during permit application): Single Family Residence: $1,290.00; Commercial Buildings: $0.52 per square foot. Contact City of Donnelly for permit and plan review fees.
Work That Does NOT Require a Permit
Contact the City of Donnelly to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- Contact City of Donnelly (phone)
- Scheduling deadline
- 24-hour notice required for all inspection requests.
Typical inspection sequence: Valley County currently performs all inspections for the City of Donnelly.
Additional Resources
- Building code: 2018 International Building Code (IBC), 2018 International Energy Conservation Code (IECC)
- Verify contractor license: Idaho Division of Occupational and Professional Licenses (DOPL)
- Idaho DOPL Electrical, Plumbing, HVAC Permits
- DOPL Building Fees Calculator
- Central District Health Septic Permits
- License lookup guide: Idaho Contractor License Requirements
- Contract template: Idaho Homeowner-Contractor Agreement
- Idaho hub: Idaho Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Donnelly before applying.
Frequently Asked Questions
Donnelly Building Permit FAQ
- Do I need a building permit in Donnelly, ID?
- A building permit is required to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure.
- How do I apply for a building permit in Donnelly, ID?
- 1. Contact City of Donnelly to coordinate submission and permit requirements. 2. Prepare two sets of plans (18" × 24" or 24" × 36") stamped by a licensed architect or engineer certified to comply with 2018 International Codes and City of Donnelly Ordinances. 3. Prepare two sets of structural calculations on 8.5" × 11" paper stamped by a licensed engineer. 4. Prepare two sets of to-scale site plans showing dwelling site, well site, septic site, and replacement septic site. 5. Submit application, plans, and site plans to City of Donnelly. 6. City staff reviews for code compliance. 7. Pay applicable permit and plan review fees, plus impact fees. 8. Obtain permit and proceed with construction. 9. Submit electrical, plumbing, and HVAC permits to State of Idaho (DOPL) separately.
- How long does it take to get a building permit in Donnelly, ID?
- Typical processing time is Approximately 2–8 weeks, depending on workload. May–October typically very busy..
- How do I schedule a building inspection in Donnelly, ID?
- Inspections can be scheduled via: Contact City of Donnelly. 24-hour notice required for all inspection requests..
Need help with your project?
Navigating permits in Donnelly can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Valley County
View all Valley County jurisdictions →