On this page 5
When a permit is required
Permit triggers and exempt work for Arco
A building permit is required for all construction within the City of Arco.
Note: Applicants should contact City of Arco Building Department for information on exempt work or minor work categories.
- Completed Building Permit Application form
- Two (2) complete sets of all plans and documents
- Plot plan with proposed structure location clearly marked
- Architectural plans and specifications appropriate to project scope
- Structural, mechanical, electrical, and plumbing plans as applicable
- Engineering calculations where required
- Building code
- 2018 International Residential Code (IRC) and 2018 International Building Code (IBC).
- Contractor requirements
- Idaho Contractors Registration Act: Contractors charging $2,000+ for work improving property must register with DOPL. Registration number required on all permits, contracts, and advertising within 60 days of registration. Minimum liability insurance $300,000; workers' compensation insurance required if employing others. Penalties for non-compliance: up to $1,000 fine or 6 months county jail.
Application process
Application → plan check → issuance → inspection → final
- 01 Download Building Permit Application form from City of Arco website or obtain from City Hall.
- 02 Complete the Building Permit Application form and prepare two (2) copies of all construction documents.
- 03 Include plot plan showing building location on property, architectural plans, structural details, mechanical/electrical layouts as applicable.
- 04 Submit filled form in person at City Hall (302 W. Grand Ave) or mail to P.O. Box 196, Arco, ID 83213.
- 05 City planning and building staff review application for code compliance and zoning conformance.
- 06 Upon approval and payment of applicable fees, permit is issued.
- 07 Two copies of permit provided (one for city file, one for job site).
- 08 Permit must be displayed at job site at all times during construction.
Required inspections
Scheduling and sequence
- (208) 527-8294 (phone)
- Inspection hours
- Monday–Thursday 8:30 AM – 4:00 PM, Friday 8:30 AM – 1:00 PM
Typical sequence: Standard inspections required: Foundation/site preparation, Framing and structural, Electrical (final or rough-in if handled locally), Plumbing (final or rough-in if handled locally), HVAC (final or rough-in if handled locally), Final inspection and Certificate of Occupancy.
Frequently asked
Common questions about Arco permits
01 Do I need a building permit in Arco, ID? ▸
02 How do I apply for a building permit in Arco, ID? ▸
03 How do I schedule a building inspection in Arco, ID? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Arco Building Department before applying. Jaspector is not legal advice.