When a permit is required
Permit triggers and exempt work for Thomasville
Thomasville publishes separate permit forms for residential building, commercial building, electrical, gas, HVAC, plumbing, roofing, swimming pools, fences, demolition/moving, signs, certificates of occupancy, and site plans.
Note: No public citywide exempt-work list was found in the reviewed Thomasville sources.
- Permit application (form varies by permit type)
- Owner affidavit
- One set of construction drawings
- Energy code compliance form
- Site plan with impervious-surface data and setbacks
- Executed new 911 address form, as applicable
- Building code
- The city's Adopted Codes and Standards sheet, updated 1-4-2024, lists 2018 IBC, IRC, IFC, IPC, IMC, IFGC, ISPSC, IEBC, and IPMC with Georgia amendments where noted; 2020 NEC; 2015 IECC with Georgia amendments; 2018 NFPA 101; 2010 DOJ ADA Standards.
- Owner-builder
- The city's owner affidavit states the owner must occupy the property as a primary residence for at least 2 years after completion, may act as contractor of record only once every 2 years, and may not personally perform electrical, gas, plumbing, or mechanical work; those trades must be permitted and completed by state licensed tradesmen.
- Contractor requirements
- Trade work must be done by State of Georgia licensed tradesmen. If the owner uses a manager, that person must be a State of Georgia licensed contractor.
Application process
Typical processing: No public city processing-time estimate found.
- 01 Select the correct city building form from the Building Forms page, such as Residential Building Permit, Commercial Building Permit, or trade permit.
- 02 Assemble the required application package. The residential permit form lists a completed permit application, owner affidavit, construction drawings, energy code compliance form, site plan, and new 911 address form, as applicable.
- 03 Email the completed package to buildinginspections@thomasville.org.
- 04 Respond to any city review comments and obtain any related planning, zoning, historic preservation, floodplain, or utility approvals required by the form.
- 05 After approval, obtain the issued permit and proceed to required inspections using the city's inspection request page or department contact.
Typical processing time: No public city processing-time estimate found.
Fee schedule
Thomasville building permit fees
Required inspections
Scheduling and sequence
- Building Inspection Request page (online-public)
- (229) 227-6983 (phone)
Typical sequence: Varies by permit type; the city's published forms show separate permit tracks for building, roofing, pools, trade permits, and certificates of occupancy.
Frequently asked
Common questions about Thomasville permits
01 Do I need a building permit in Thomasville, GA? ▸
02 How do I apply for a building permit in Thomasville, GA? ▸
03 How long does it take to get a building permit in Thomasville, GA? ▸
04 How do I schedule a building inspection in Thomasville, GA? ▸