jaspector
City building permits

Centerville

How to apply for a building permit in Centerville, Georgia. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$10.00 administrative fee
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Centerville Building Inspections Department

§ 02

When a permit is required

Permit triggers and exempt work for Centerville

New residential and commercial construction, additions and alterations, miscellaneous changes and repairs or total replacement of electrical, plumbing, and HVAC systems, installation or relocation of mobile homes in approved parks, and swimming pools

Note: No public exempt-work list was found

Required documents
  • Permit application
  • Building plans
  • Contractor information
  • Utilities review materials needed for the Utilities Superintendent
  • For sign permits: colored rendering, dimensions, and site plan for freestanding signs
Building code
Building Inspection Department enforces the city's construction codes. No separate current local code-adoption ordinance was located; Georgia state minimum construction codes apply at minimum
Owner-builder
Building codes apply whether work is completed by a hired contractor or private homeowner
Contractor requirements
Application forms request state license information for general, plumbing, electrical, and HVAC contractors; Georgia state licensing rules apply
§ 03

Application process

Typical processing: Site plan review can take about two weeks for basic review and up to 45 days when stormwater review is required

  1. 01
    Contact the Building Inspections Department if the permit trigger is unclear
  2. 02
    Download the construction permit application or roofing permit application from the city site
  3. 03
    Submit the application and plans to the City Clerk office / Building Inspector at 300 E. Church Street
  4. 04
    Obtain review and approval from the Centerville Building Inspector and Utilities Superintendent before permit issuance
  5. 05
    Pay the required permit fees
  6. 06
    Schedule inspections through City Hall / Building Inspections during construction

Typical processing time: Site plan review can take about two weeks for basic review and up to 45 days when stormwater review is required

Source: City of Centerville Building Inspections Department ↗

§ 04

Fee schedule

Effective 2020

Fee type
Amount
01
Minimum permit fee
$10.00 administrative fee
02
Permit fee formula
Mixed. Sign permit fees are based on a percentage of construction cost; multiple permit-specific charges by type

Electronic payment processing fee: $1.80 per payment (effective August 7, 2023; non-refundable)

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2020) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Administrative services at City Hall include scheduling building inspections (phone)
  • Contact John Burt or the City Clerk office (phone)
Inspection hours
Monday through Friday, 8:00 a.m. to 5:00 p.m.

Source: City of Centerville Building Inspections Department ↗

§ 06

Frequently asked

Common questions about Centerville permits

01 Do I need a building permit in Centerville, GA?
New residential and commercial construction, additions and alterations, miscellaneous changes and repairs or total replacement of electrical, plumbing, and HVAC systems, installation or relocation of mobile homes in approved parks, and swimming pools
02 How much does a building permit cost in Centerville, GA?
Building permit fees in Centerville, GA are set by the local building department and vary by project type and valuation. The minimum permit fee is $10.00 administrative fee. Fees are calculated as: Mixed. Sign permit fees are based on a percentage of construction cost; multiple permit-specific charges by type.
03 How do I apply for a building permit in Centerville, GA?
To apply for a building permit in Centerville, GA, follow these steps: 1. Contact the Building Inspections Department if the permit trigger is unclear 2. Download the construction permit application or roofing permit application from the city site 3. Submit the application and plans to the City Clerk office / Building Inspector at 300 E. Church Street 4. Obtain review and approval from the Centerville Building Inspector and Utilities Superintendent before permit issuance 5. Pay the required permit fees 6. Schedule inspections through City Hall / Building Inspections during construction
04 How long does it take to get a building permit in Centerville, GA?
Building permit processing times in Centerville, GA typically run Site plan review can take about two weeks for basic review and up to 45 days when stormwater review is required. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Centerville, GA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Centerville, GA via: Administrative services at City Hall include scheduling building inspections, Contact John Burt or the City Clerk office.
last verified April 2026 source City of Centerville Building Inspections Department ↗ entry id permits/georgia/houston/centerville

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Centerville Building Inspections Department before applying. Jaspector is not legal advice.