On this page 6
When a permit is required
Permit triggers and exempt work for Sandy Springs
Sandy Springs states a building permit is required for structural work and projects involving multiple licensed trades; commercial permits are required for constructing, altering, enlarging, repairing, or demolishing buildings or tenant spaces.
- Exempt General aesthetic improvements such as painting and carpeting for commercial spaces
- Exempt Replacing a small number of individually rotted planks on a deck or porch
- Exempt Replacing individual shingles on pitched roofs
- Exempt Other minor work exempt under the adopted state codes
- Application-specific construction drawings
- authorized agent or owner authorization affidavits
- site plans
- and other permit-type checklists posted by the city.
- Building code
- City inspection page states Sandy Springs enforces state-adopted building codes. Because Georgia DCA adopted new statewide codes effective January 1, 2026, the current baseline is the 2024 ICC family plus 2023 NEC with Georgia amendments where applicable.
- Permit validity
- Not clearly stated on the main pages reviewed; under adopted state minimum codes, permits generally expire after 180 days of no commencement or no continued activity unless extended.
- Owner-builder
- Owner-contractor affidavits are published by the city for residential work.
- Contractor requirements
- Sandy Springs states commercial building permits can only be issued to a state licensed general contractor.
Application process
Typical processing: No single citywide estimate posted on the pages reviewed.
- 01 Use Plan Sandy Springs and the city permit pages to determine permit type and submittal requirements.
- 02 Create an account in Build Sandy Springs.
- 03 Submit the online application, drawings, affidavits, and other required materials.
- 04 City staff review for code, zoning, and applicable environmental/development compliance.
- 05 Respond to comments and upload revisions if requested.
- 06 Pay invoices in the portal.
- 07 Permit is issued and inspections are requested through the same portal.
Typical processing time: No single citywide estimate posted on the pages reviewed.
Source: City of Sandy Springs Community Development Department ↗
Fee schedule
Sandy Springs building permit fees
The city states the easiest way to pay permit fees is through Build Sandy Springs by credit or debit card.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- City portal (online)
- Inspection hours
- Requests submitted before 2:00 p.m. on a weekday are scheduled for the following business day
Typical sequence: Rough inspections for each trade, then finals for each trade, then CO or CC as applicable
City staff publish inspection guidance and "How to Pass Your Inspection the First Time" resources; failed items must be corrected before completion
Frequently asked
Common questions about Sandy Springs permits
01 Do I need a building permit in Sandy Springs, GA? ▸
02 How much does a building permit cost in Sandy Springs, GA? ▸
03 How do I apply for a building permit in Sandy Springs, GA? ▸
04 How long does it take to get a building permit in Sandy Springs, GA? ▸
05 What work is exempt from building permits in Sandy Springs, GA? ▸
06 How do I schedule a building inspection in Sandy Springs, GA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Sandy Springs Community Development Department before applying. Jaspector is not legal advice.