jaspector
City building permits

City of Sandy Springs

How to apply for a building permit in City of Sandy Springs, Georgia. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$50 minimum permit fee
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Sandy Springs Community Development Department

Street address
Sandy Springs City Hall, 1 Galambos Way, Sandy Springs, GA 30328
Coverage
City permit authority for work inside Sandy Springs city limits.
Online portal
Build Sandy Springs / OpenGov
Build Sandy Springs / OpenGov
§ 02

When a permit is required

Permit triggers and exempt work for Sandy Springs

Sandy Springs states a building permit is required for structural work and projects involving multiple licensed trades; commercial permits are required for constructing, altering, enlarging, repairing, or demolishing buildings or tenant spaces.

General aesthetic improvements such as painting and carpeting for commercial spaces
Replacing a small number of individually rotted planks on a deck or porch
Replacing individual shingles on pitched roofs
Other minor work exempt under the adopted state codes
  • Exempt General aesthetic improvements such as painting and carpeting for commercial spaces
  • Exempt Replacing a small number of individually rotted planks on a deck or porch
  • Exempt Replacing individual shingles on pitched roofs
  • Exempt Other minor work exempt under the adopted state codes
Required documents
  • Application-specific construction drawings
  • authorized agent or owner authorization affidavits
  • site plans
  • and other permit-type checklists posted by the city.
Building code
City inspection page states Sandy Springs enforces state-adopted building codes. Because Georgia DCA adopted new statewide codes effective January 1, 2026, the current baseline is the 2024 ICC family plus 2023 NEC with Georgia amendments where applicable.
Permit validity
Not clearly stated on the main pages reviewed; under adopted state minimum codes, permits generally expire after 180 days of no commencement or no continued activity unless extended.
Owner-builder
Owner-contractor affidavits are published by the city for residential work.
Contractor requirements
Sandy Springs states commercial building permits can only be issued to a state licensed general contractor.
§ 03

Application process

Typical processing: No single citywide estimate posted on the pages reviewed.

  1. 01
    Use Plan Sandy Springs and the city permit pages to determine permit type and submittal requirements.
  2. 02
    Create an account in Build Sandy Springs.
  3. 03
    Submit the online application, drawings, affidavits, and other required materials.
  4. 04
    City staff review for code, zoning, and applicable environmental/development compliance.
  5. 05
    Respond to comments and upload revisions if requested.
  6. 06
    Pay invoices in the portal.
  7. 07
    Permit is issued and inspections are requested through the same portal.

Typical processing time: No single citywide estimate posted on the pages reviewed.

Source: City of Sandy Springs Community Development Department ↗

§ 04

Fee schedule

Sandy Springs building permit fees

Fee type
Amount
01
Minimum permit fee
$50 minimum permit fee
02
Plan check fee
Review fees are embedded in the city fee schedule and vary by permit type.
03
Permit fee formula
Building permit fees are valuation-based plus permit-type flat fees in the published Community Development fee schedule.
04
Reinspection fee
Not clearly itemized on the main permit pages reviewed; invoices and reinspection charges are handled through the portal.

The city states the easiest way to pay permit fees is through Build Sandy Springs by credit or debit card.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Requests submitted before 2:00 p.m. on a weekday are scheduled for the following business day

Typical sequence: Rough inspections for each trade, then finals for each trade, then CO or CC as applicable

City staff publish inspection guidance and "How to Pass Your Inspection the First Time" resources; failed items must be corrected before completion

§ 06

Frequently asked

Common questions about Sandy Springs permits

01 Do I need a building permit in Sandy Springs, GA?
Sandy Springs states a building permit is required for structural work and projects involving multiple licensed trades; commercial permits are required for constructing, altering, enlarging, repairing, or demolishing buildings or tenant spaces.
02 How much does a building permit cost in Sandy Springs, GA?
Building permit fees in Sandy Springs, GA are set by the local building department and vary by project type and valuation. The minimum permit fee is $50 minimum permit fee. Fees are calculated as: Building permit fees are valuation-based plus permit-type flat fees in the published Community Development fee schedule.. Plan check fee: Review fees are embedded in the city fee schedule and vary by permit type..
03 How do I apply for a building permit in Sandy Springs, GA?
To apply for a building permit in Sandy Springs, GA, follow these steps: 1. Use Plan Sandy Springs and the city permit pages to determine permit type and submittal requirements. 2. Create an account in Build Sandy Springs. 3. Submit the online application, drawings, affidavits, and other required materials. 4. City staff review for code, zoning, and applicable environmental/development compliance. 5. Respond to comments and upload revisions if requested. 6. Pay invoices in the portal. 7. Permit is issued and inspections are requested through the same portal.
04 How long does it take to get a building permit in Sandy Springs, GA?
Building permit processing times in Sandy Springs, GA typically run No single citywide estimate posted on the pages reviewed.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Sandy Springs, GA?
Not all construction work requires a permit in Sandy Springs, GA. The following work is generally exempt: General aesthetic improvements such as painting and carpeting for commercial spaces; Replacing a small number of individually rotted planks on a deck or porch; Replacing individual shingles on pitched roofs; Other minor work exempt under the adopted state codes. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Sandy Springs, GA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Sandy Springs, GA via: City portal.
last verified April 2026 source City of Sandy Springs Community Development Department ↗ entry id permits/georgia/fulton/sandy-springs

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Sandy Springs Community Development Department before applying. Jaspector is not legal advice.