jaspector
§ GA Dooly County
City building permits

Pinehurst

How to apply for a building permit in Pinehurst, Georgia. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Dooly County Building Department

Street address
113 North Third Street, Vienna, GA 31092
Coverage
The county building page expressly states that the office provides building permits and inspection services in Pinehurst.
Online portal
CityReporter
CityReporter
§ 02

When a permit is required

Permit triggers and exempt work for Pinehurst

Most building projects require a permit, including new construction, structural remodels, additions, decks, roofing, re-roofing, siding replacement, window replacement, door replacement, carports, sheds, portable storage buildings, modular homes, manufactured homes, spas, and swimming pools. Separate trade permits may also be required.

Note: No public exempt-work list was found for Pinehurst beyond the county statement that most building projects require a permit.

Required documents
  • Address
  • Tax parcel number
  • Project value
  • Work area
  • Description of work
  • Signed application agreement
  • Uploaded plans or project documents
  • Septic or sewer approval
  • Water provision proof
  • Contractor details
  • Bedroom and bathroom counts
  • Floor plan
  • Site plan with setbacks
  • Electrical plan
  • Plumbing plan
  • HVAC plan
Building code
2024 ICC building codes; Georgia state minimum standard construction codes apply statewide.
Owner-builder
An owner-builder must personally perform the work or use licensed contractors as required by Title 43-41-17 and may not place the structure for sale within the next 24 months if claiming the owner-builder declaration.
Contractor requirements
General and trade contractor license information is required. Specialty permits must be purchased by the licensed specialty contractor for that trade.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Confirm permit need with the Dooly County Building Department.
  2. 02
    Create a CityReporter account or use the county PDF application.
  3. 03
    Submit project details, applicant information, parcel information, and required documents.
  4. 04
    Sign the application agreement and submit for review.
  5. 05
    Pay fees after county review and fee notice.
  6. 06
    Receive the issued permit from the county.

Source: Dooly County Building Department ↗

§ 04

Fee schedule

Effective 2026-03-19

Fee type
Amount
01
Minimum permit fee
50
02
Plan check fee
100
03
Permit fee formula
Mostly flat or per-square-foot by project type. County flat and per-square-foot schedule by project type.
04
Reinspection fee
65
05
Penalty (no permit)
50 percent of permit fee for work without permit; second and later reinspection $100.00

Portal payments are processed through Authorize.net after review.

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2026-03-19) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • CityReporter portal (phone)
  • Phone: 229-268-4228 (phone)
Scheduling deadline
24 hours notice required

Typical sequence: County inspection sequences for foundation, under slab, framing, insulation, final, and applicable trade inspections.

§ 06

Frequently asked

Common questions about Pinehurst permits

01 Do I need a building permit in Pinehurst, GA?
Most building projects require a permit, including new construction, structural remodels, additions, decks, roofing, re-roofing, siding replacement, window replacement, door replacement, carports, sheds, portable storage buildings, modular homes, manufactured homes, spas, and swimming pools. Separate trade permits may also be required.
02 How much does a building permit cost in Pinehurst, GA?
Building permit fees in Pinehurst, GA are set by the local building department and vary by project type and valuation. The minimum permit fee is 50. Fees are calculated as: Mostly flat or per-square-foot by project type. County flat and per-square-foot schedule by project type.. Plan check fee: 100.
03 How do I apply for a building permit in Pinehurst, GA?
To apply for a building permit in Pinehurst, GA, follow these steps: 1. Confirm permit need with the Dooly County Building Department. 2. Create a CityReporter account or use the county PDF application. 3. Submit project details, applicant information, parcel information, and required documents. 4. Sign the application agreement and submit for review. 5. Pay fees after county review and fee notice. 6. Receive the issued permit from the county.
04 How do I schedule a building inspection in Pinehurst, GA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Pinehurst, GA via: CityReporter portal, Phone: 229-268-4228. 24 hours notice required.
last verified April 2026 source Dooly County Building Department ↗ entry id permits/georgia/dooly/pinehurst

Educational reference. Permit rules and fees change — confirm current requirements directly with Dooly County Building Department before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Dooly County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Dooly County jurisdictions →