City Building Permits
Lilly, GA - 2026 Building Permit Guide
How to apply for a building permit in Lilly, Georgia. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
The county building page expressly states that the office provides building permits and inspection services in Lilly.
- Department
- Dooly County Building Department
- Address
- 113 North Third Street, Vienna, GA 31092
- Phone
- 229-268-4228
- zoning@doolycountyga.com
Online Permit Portal
Platform: CityReporter • Account required: Yes • Submission: In-person only
Additional resources:
Application Process
- Confirm permit need with the Dooly County Building Department.
- Create a CityReporter account or use the county PDF application.
- Submit project details, applicant information, parcel information, and required documents.
- Sign the application agreement and submit for review.
- Pay fees after county review and fee notice.
- Receive the issued permit from the county.
Source: Dooly County Building Department
General Requirements
Most building projects require a permit, including new construction, structural remodels, additions, decks, roofing, re-roofing, siding replacement, window replacement, door replacement, carports, sheds, portable storage buildings, modular homes, manufactured homes, spas, and swimming pools. Separate trade permits may also be required.
Required Documents
- Address
- Tax parcel number
- Project value
- Work area
- Description of work
- Signed application agreement
- Uploaded plans or project documents
- Septic or sewer approval
- Water provision proof
- Contractor details
- Bedroom and bathroom counts
- Floor plan
- Site plan with setbacks
- Electrical plan
- Plumbing plan
- HVAC plan
- Building code
- 2024 ICC building codes; Georgia state minimum standard construction codes apply statewide.
- Owner-builder
- An owner-builder must personally perform the work or use licensed contractors as required by Title 43-41-17 and may not place the structure for sale within the next 24 months if claiming the owner-builder declaration.
- Contractor requirements
- General and trade contractor license information is required. Specialty permits must be purchased by the licensed specialty contractor for that trade.
Fees
- Minimum permit fee
- 50
- Plan check fee
- 100
- Permit fee formula
- Mostly flat or per-square-foot by project type. County flat and per-square-foot schedule by project type.
- Reinspection fee
- 65
- Penalty (no permit)
- 50 percent of permit fee for work without permit; second and later reinspection $100.00
- Payment note
- Portal payments are processed through Authorize.net after review.
Fees change. Verify current amounts at the official fee schedule (effective 2026-03-19).
Work That Does NOT Require a Permit
Contact the Dooly County Building Department to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- ()
- ()
- Scheduling deadline
- 24 hours notice required
Typical inspection sequence: County inspection sequences for foundation, under slab, framing, insulation, final, and applicable trade inspections.
Additional Resources
- Building code: 2024 ICC building codes; Georgia state minimum standard construction codes apply statewide.
- Zoning information: View zoning info
- Tax Parcel Search
- License lookup guide: Georgia Contractor License Requirements
- Contract template: Georgia Homeowner-Contractor Agreement
- Georgia hub: Georgia Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Dooly County Building Department before applying.
Frequently Asked Questions
Lilly Building Permit FAQ
- Do I need a building permit in Lilly, GA?
- Most building projects require a permit, including new construction, structural remodels, additions, decks, roofing, re-roofing, siding replacement, window replacement, door replacement, carports, sheds, portable storage buildings, modular homes, manufactured homes, spas, and swimming pools. Separate trade permits may also be required.
- How much does a building permit cost in Lilly, GA?
- The minimum permit fee is 50. Fees are calculated as: Mostly flat or per-square-foot by project type. County flat and per-square-foot schedule by project type.. Plan check fee: 100.
- How do I apply for a building permit in Lilly, GA?
- 1. Confirm permit need with the Dooly County Building Department. 2. Create a CityReporter account or use the county PDF application. 3. Submit project details, applicant information, parcel information, and required documents. 4. Sign the application agreement and submit for review. 5. Pay fees after county review and fee notice. 6. Receive the issued permit from the county.
- How do I schedule a building inspection in Lilly, GA?
- Inspections can be scheduled via: , . 24 hours notice required.
Need help with your project?
Navigating permits in Lilly can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Dooly County
View all Dooly County jurisdictions →