When a permit is required
Permit triggers and exempt work for Attapulgus
The joint department states all permits relating to construction are issued from this department, including building, electrical, plumbing, mechanical, mobile home, low voltage electrical installation, and sprinkler installation permits. County regulations require permits for building, electrical, gas, mechanical, plumbing, and driveway work.
Note: No Attapulgus-specific public exempt-work list was found. The Decatur County construction regulations publish limited exemptions for agricultural equipment-only structures on 25 acres or more, normal maintenance and repair, and residential accessory structures under 250 square feet, but current city-specific materials do not clearly state whether that county exemption list is applied unchanged inside Attapulgus city limits.
- Application
- Project description
- Site plan showing existing and proposed buildings
- Scaled drawings and specifications when required
- Deed or plat showing ownership
- Decatur County Health Department approval for private well or septic projects
- Floodplain and other special approvals where applicable
- Building code
- No Attapulgus-specific published code adoption page was found. Georgia DCA's current mandatory statewide minimum codes include the 2024 IBC, 2024 IRC, 2024 IPC, 2024 IMC, 2024 IFGC, 2024 ISPSC, 2023 NEC, and 2015 IECC, each with Georgia amendments or supplements as applicable.
- Permit validity
- County regulations state a permit becomes invalid if work is not commenced within 6 months after issuance, or if work is suspended or abandoned for 6 months. Written 90-day extensions may be granted for justifiable cause.
- Owner-builder
- No Attapulgus-specific owner-builder rule was found. Georgia SOS states an owner does not need a state contractor license to build the owner's own house, subject to local requirements.
- Contractor requirements
- The joint department requires contractors to complete portal registration before pulling permits. Georgia requires licensed residential contractors for covered residential work over $2,500 and licensed trade contractors where applicable.
Application process
Typical processing: No public permit issuance SLA was found. The SmartGov portal asks applicants to allow 24 business hours for an email response about permit status.
- 01 Confirm with Attapulgus City Hall and the Bainbridge-Decatur County Building Department that the parcel is inside Attapulgus and that the joint department is the correct intake point for the proposed work.
- 02 Create a SmartGov account or visit the Bainbridge-Decatur County office in person.
- 03 If a contractor is applying, complete contractor registration in the portal before pulling permits.
- 04 Submit the permit application with project description, site information, and required plans or approvals. The county regulations allow the Building Official to require scaled drawings, specifications, site plan, ownership evidence, and health department approval for well or septic projects.
- 05 Await plan review. The regulations state the Building Official must act without unreasonable or unnecessary delay. The portal asks applicants to allow 24 business hours for an email response regarding permit application status.
- 06 Pay the assessed fee. County regulations state no permit is issued until fees are paid.
- 07 Receive the permit and keep approved plans on site.
Typical processing time: No public permit issuance SLA was found. The SmartGov portal asks applicants to allow 24 business hours for an email response about permit status.
Source: Bainbridge-Decatur County Building Department / Bainbridge-Decatur County Planning Department ↗
Required inspections
Scheduling and sequence
- SmartGov portal request inspection function (phone)
- Phone at (229) 248-2000 (phone)
- Email permittech@bainbridgecity.com (email)
- Inspection hours
- Monday through Friday, 8:00 a.m. to 5:00 p.m.
- Time windows
Typical sequence: County regulations publish foundation, frame, insulation, wallboard, and final building inspections; trade rough-in and final inspections; and final approval before certificate of occupancy.
Frequently asked
Common questions about Attapulgus permits
01 Do I need a building permit in Attapulgus, GA? ▸
02 How do I apply for a building permit in Attapulgus, GA? ▸
03 How long does it take to get a building permit in Attapulgus, GA? ▸
04 How do I schedule a building inspection in Attapulgus, GA? ▸