On this page 6
When a permit is required
Permit triggers and exempt work for Savannah
Savannah requires permits for construction governed by federal, state, and local codes, including new construction, additions, renovations, demolition, roofing, windows, pools, solar, fences, and trade work.
- Exempt Exterior paint
- Exempt Roof patch less than 100 square feet
- Exempt Replace roof shingles only
- Exempt Storm windows
- Exempt Window replacement with no change in size
- Exempt Carpet in non-assembly areas
- Exempt Fiberglass insulation
- Exempt Minor porch repairs
- Exempt Concrete patio on grade
- Exempt Screen an existing roofed porch
- Exempt Replace porch flooring
- Exempt Repair steps using like materials and dimensions
- Exempt Kitchen cabinets
- Exempt Minor plumbing leak repairs
- Exempt Replace switches, plates, same-type outlets, same-type light fixtures, breakers, fuses
- Exempt Portable heating, ventilating, and cooling equipment
- Exempt Appliance repairs as listed on the city exempt-work handout
- Exempt Gutters and downspouts
- Exempt Wood or chain link fence under 7 feet
- Exempt Free-standing open roof pergola under 200 square feet and under 10 feet tall
- Exempt Portable pool less than 2 feet deep and less than 250 square feet
- Completed permit application
- Project-specific plans
- Plan review payment at application
- Approved plans on site for inspection
- Additional zoning or historic review documents where applicable
- Building code
- Enforcement of federal, state, and local codes. Georgia state minimum codes apply.
- Permit validity
- 90-day permit extension fee is published; permit reinstatement fee is also published.
- Owner-builder
- If acting as your own contractor, you may call in your own building inspections but may not call in inspections for your trades.
- Contractor requirements
- Appropriately licensed contractors may submit online inspection requests through eTRAC. Georgia state licensing rules apply.
Application process
Typical processing: No general citywide issuance turnaround published. Inspection requests are generally next available day.
- 01 Identify the permit type and whether the work is exempt using Savannah's published handouts.
- 02 Prepare the application package and plans for Development Services review.
- 03 Submit through eTRAC or the city permit counter, depending on project type and submittal needs.
- 04 Pay the plan review fee at application.
- 05 Respond to review comments if issued and wait for approval.
- 06 Pay the permit fee at issuance.
- 07 Post the permit, complete required inspections, and obtain final approval or Certificate of Occupancy.
Typical processing time: No general citywide issuance turnaround published. Inspection requests are generally next available day.
Fee schedule
Savannah building permit fees
Plan review is paid at application. Permit fee is paid at issuance. A $5.00 technology fee is added to listed permit types.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 912-651-6530 (phone)
- eTRAC portal (for appropriately licensed contractors) (online)
- Inspection hours
- 7:15 a.m. to 4:00 p.m. for next day building inspections. Trade inspections requested between 7:15 a.m. and 8:30 a.m. are same day in most cases.
Typical sequence: Typical sequence is project-dependent; building, electrical, mechanical, plumbing, and final inspections as applicable.
Frequently asked
Common questions about Savannah permits
01 Do I need a building permit in Savannah, GA? ▸
02 How much does a building permit cost in Savannah, GA? ▸
03 How do I apply for a building permit in Savannah, GA? ▸
04 How long does it take to get a building permit in Savannah, GA? ▸
05 What work is exempt from building permits in Savannah, GA? ▸
06 How do I schedule a building inspection in Savannah, GA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Savannah Development Services Department before applying. Jaspector is not legal advice.