jaspector
City building permits

White

How to apply for a building permit in White, Georgia. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of White, Georgia

Coverage
Applies within White city limits.
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for White

The city publishes a building permit fee schedule covering building, additions, accessory structures over 200 square feet, remodels, decks, retaining walls, trade permits, pools, demolition, and related work.

Note: No standalone White exempt-work list was located on the reviewed official pages.

Required documents
  • Plan package
  • Supporting documents as required by the city's plans checklist and plan-review schedule
Building code
No separate White code-adoption page was located on the reviewed site; Georgia state minimum codes apply.
Permit validity
The city's published fee schedule includes a permit renewal fee for 6 months.
Contractor requirements
Georgia state licensing rules apply; city fee and permit materials do not provide a more detailed public contractor checklist.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Contact the city using the main phone or listed staff contacts to obtain the current building permit application path.
  2. 02
    Use the published plans checklist, building fee schedule, and plan-review fee schedule to assemble the required submittal package.
  3. 03
    Submit plans and pay city-assessed permit and plan-review fees as directed by staff.
  4. 04
    Complete inspections and obtain certificate of occupancy before occupancy.

Source: City of White, Georgia ↗

§ 04

Fee schedule

White building permit fees

Fee type
Amount
01
Minimum permit fee
Residential building permit minimum $75; addition permit minimum $75; deck permit minimum $50
02
Plan check fee
Published separately at https://cityofwhitega.com/wp-content/uploads/2025/11/Updated-Plan-Review-Fee-Schedule_White.pdf, including preliminary plat, construction plan review, final plat, stormwater, and other review fees
03
Permit fee formula
Residential building permit $0.31 per square foot; unfinished area $0.15 per square foot; remodel permit $0.25 per square foot; accessory structure over 200 square feet $0.15 per square foot or $75 minimum; commercial permits use valuation and permit-fee tables
04
Reinspection fee
Reinspection $25 first and $50 additional
05
Penalty (no permit)
Penalty for occupancy prior to final $100

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

Typical sequence: Not publicly itemized

§ 06

Frequently asked

Common questions about White permits

01 Do I need a building permit in White, GA?
The city publishes a building permit fee schedule covering building, additions, accessory structures over 200 square feet, remodels, decks, retaining walls, trade permits, pools, demolition, and related work.
02 How much does a building permit cost in White, GA?
Building permit fees in White, GA are set by the local building department and vary by project type and valuation. The minimum permit fee is Residential building permit minimum $75; addition permit minimum $75; deck permit minimum $50. Fees are calculated as: Residential building permit $0.31 per square foot; unfinished area $0.15 per square foot; remodel permit $0.25 per square foot; accessory structure over 200 square feet $0.15 per square foot or $75 minimum; commercial permits use valuation and permit-fee tables. Plan check fee: Published separately at https://cityofwhitega.com/wp-content/uploads/2025/11/Updated-Plan-Review-Fee-Schedule_White.pdf, including preliminary plat, construction plan review, final plat, stormwater, and other review fees.
03 How do I apply for a building permit in White, GA?
To apply for a building permit in White, GA, follow these steps: 1. Contact the city using the main phone or listed staff contacts to obtain the current building permit application path. 2. Use the published plans checklist, building fee schedule, and plan-review fee schedule to assemble the required submittal package. 3. Submit plans and pay city-assessed permit and plan-review fees as directed by staff. 4. Complete inspections and obtain certificate of occupancy before occupancy.
last verified April 2026 source City of White, Georgia ↗ entry id permits/georgia/bartow/white

Educational reference. Permit rules and fees change — confirm current requirements directly with City of White, Georgia before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Bartow County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Bartow County jurisdictions →