When a permit is required
Permit triggers and exempt work for Statham
Statham publishes permit applications for residential building, commercial building, demolition, electrical, mechanical, plumbing, roofing, sign, swimming pool, driveway, storage building, and fence and walls
Note: No public exempt-work list was found on the reviewed Statham building-permit pages
- Completed building permit application
- Contractor licensing documentation
- Completed trade permit application
- Subcontractor licensing documentation
- GSWCC Level 1A certification
- Two sets of scaled construction drawings
- House location plan
- ESC plans if applicable
- Septic permit if applicable
- Completed water/sewer application
- Building code
- Statham's forms require compliance with the International Building Codes. As a Georgia jurisdiction, Statham must enforce the Georgia State Minimum Standard Codes
- Permit validity
- No general expiration rule was found on the city's public permit page, but the city does charge $150 for a 3-month permit extension
- Owner-builder
- Statham publishes a Homeowner Affidavit form, but the reviewed building-permit page does not summarize the owner-builder standards
- Contractor requirements
- Statham's checklist requires state license card, business license, and driver's license for contractor and subcontractor trades
Application process
Typical processing: Inspections are given within two business days of request; no public permit-review turnaround was posted
- 01 Download the correct permit form and checklist from the city's Building Permits page
- 02 Assemble the application package, including plans, site information, contractor documents, and any required utility, septic, or erosion-control approvals
- 03 Submit the permit application to the city office
- 04 City staff review the submittal and calculate permit and plan-review fees under the adopted fee schedule
- 05 Pay permit fees before issuance
- 06 Post the permit and request inspections through the city office
- 07 When the structure is 100 percent complete and all fees are paid, request final inspection for CO or completion
Typical processing time: Inspections are given within two business days of request; no public permit-review turnaround was posted
Fee schedule
Effective 2023-01-17
Fees are collected prior to permit issuance
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2023-01-17) before budgeting.
Required inspections
Scheduling and sequence
- Call the office at 770-725-7771; inspectors do not take requests directly (phone)
- Time windows
- Inspections are given within two business days of the day the request is received; next-business-day inspection is guaranteed if the 4:00 p.m. cutoff is met
Typical sequence: Published residential sequence includes foundation, foundation wall steel where applicable, under-slab plumbing, slab cover, framing rough, moisture barrier, MEP rough, insulation, permanent power, and final inspection, plus final site compliance
Frequently asked
Common questions about Statham permits
01 Do I need a building permit in Statham, GA? ▸
02 How much does a building permit cost in Statham, GA? ▸
03 How do I apply for a building permit in Statham, GA? ▸
04 How long does it take to get a building permit in Statham, GA? ▸
05 How do I schedule a building inspection in Statham, GA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Statham Building Department before applying. Jaspector is not legal advice.