jaspector
§ FL Lake County
City building permits

City of Groveland

How to apply for a building permit in City of Groveland, Florida. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$50
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Groveland Building Division

Street address
6825 SR 50, Groveland, FL 34736
Coverage
Groveland operates its own building department and eTRAKiT system.
Online portal
eTRAKiT
eTRAKiT
§ 02

When a permit is required

Permit triggers and exempt work for Groveland

Permits are required for standard new construction, additions, remodels, reroofs, change of occupancy, solar, pools, screen rooms, demolitions, and related regulated work.

Note: Applicants should confirm any FBC exemption with Groveland Building Division.

Required documents
  • Building permit application
  • Residential or specialty permit packets
  • Product approval sheet
  • Owner-builder disclosure
  • Notice of commencement
  • Contractor registration
  • Project-specific forms
Building code
Florida Building Code (8th Edition, 2023) mandatory statewide
Permit validity
The fee schedule includes renewal of expired permits and related charges; applicants should confirm active duration with the city.
Owner-builder
The city publishes an owner-builder disclosure statement.
Contractor requirements
Groveland publishes a contractor registration and eTRAKiT form requiring state license, liability insurance, workers compensation insurance or exemption, and city certificate-holder information.
§ 03

Application process

Typical processing: Varies; plan review typically 5-10 business days.

  1. 01
    Confirm the property is within Groveland city limits.
  2. 02
    Review the city's building application and permit packets and assemble the required forms and plans.
  3. 03
    Register for eTRAKiT if using online contractor functions.
  4. 04
    Submit the permit application and required attachments to the city through the published process.
  5. 05
    Pay fees, including electronic filing and administrative fees where applicable.
  6. 06
    Schedule inspections through eTRAKiT after issuance.
  7. 07
    Complete all required inspections and final approvals before use or occupancy.

Typical processing time: Varies; plan review typically 5-10 business days.

Source: City of Groveland Building Division ↗

§ 04

Fee schedule

Effective 2026-03

Fee type
Amount
01
Minimum permit fee
$50
02
Plan check fee
Half of permit fees with minimums
03
Permit fee formula
Residential primary-structure permits: $50 plus $6 per $1,000 job valuation; residential remodel/addition/accessory: $50 plus $7 per $1,000; commercial primary: $75 plus $8.50 per $1,000; commercial remodel/addition/accessory: $75 plus $9.50 per $1,000
04
Reinspection fee
$85
05
Penalty (no permit)
$250 per occurrence (failure to schedule inspection); double fees for work started before issuance

Electronic filing fee and administrative fee are each 15% of total permit fees.

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2026-03) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule

Typical sequence: Scheduling building inspections requires contractor or public registration.

Source: City of Groveland Building Division ↗

§ 06

Frequently asked

Common questions about Groveland permits

01 Do I need a building permit in Groveland, FL?
Permits are required for standard new construction, additions, remodels, reroofs, change of occupancy, solar, pools, screen rooms, demolitions, and related regulated work.
02 How much does a building permit cost in Groveland, FL?
Building permit fees in Groveland, FL are set by the local building department and vary by project type and valuation. The minimum permit fee is $50. Fees are calculated as: Residential primary-structure permits: $50 plus $6 per $1,000 job valuation; residential remodel/addition/accessory: $50 plus $7 per $1,000; commercial primary: $75 plus $8.50 per $1,000; commercial remodel/addition/accessory: $75 plus $9.50 per $1,000. Plan check fee: Half of permit fees with minimums.
03 How do I apply for a building permit in Groveland, FL?
To apply for a building permit in Groveland, FL, follow these steps: 1. Confirm the property is within Groveland city limits. 2. Review the city's building application and permit packets and assemble the required forms and plans. 3. Register for eTRAKiT if using online contractor functions. 4. Submit the permit application and required attachments to the city through the published process. 5. Pay fees, including electronic filing and administrative fees where applicable. 6. Schedule inspections through eTRAKiT after issuance. 7. Complete all required inspections and final approvals before use or occupancy.
04 How long does it take to get a building permit in Groveland, FL?
Building permit processing times in Groveland, FL typically run Varies; plan review typically 5-10 business days.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Groveland, FL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Groveland, FL via: eTRAKiT.
last verified April 2026 source City of Groveland Building Division ↗ entry id permits/florida/lake/groveland

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Groveland Building Division before applying. Jaspector is not legal advice.