On this page 5
When a permit is required
Permit triggers and exempt work for Cross City
A building permit is required for all construction within the Town of Cross City limits.
- Warranty deed
- Signed survey
- 911 address verification
- Site plan to scale
- Septic tank permit or letter from sewer company
- Signed application
- Recorded Notice of Commencement
- Engineered plans marked 130 mph
- Truss engineering marked 130 mph
- Product approval paper
- Driveway approval before final power release
- City approval paperwork if in city limits
- Building code
- 2023 Florida Building Code, 8th Edition (effective December 31, 2023)
- Contractor requirements
- Separate permits must be secured for electrical, plumbing, mechanical, roofing, gas, and similar trade work.
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm the parcel is inside the Town of Cross City.
- 02 Contact town hall at 352-498-3306 to determine what city approval paperwork is required before county permit issuance.
- 03 Prepare the county permit package for the project type.
- 04 Include the city approval paperwork required by the county checklist for parcels in city limits.
- 05 Submit through Dixie County Building and Zoning and complete county review, issuance, and inspections.
Required inspections
Scheduling and sequence
- Dixie County iWorQ Inspection Portal (online)
- Dixie County Building: 352-498-1236 (phone)
- Inspection hours
- Monday-Friday, 8:00 AM to 12:00 PM and 1:00 PM to 5:00 PM
Typical sequence: Inspections are handled by Dixie County after permit issuance.
Frequently asked
Common questions about Cross City permits
01 Do I need a building permit in Cross City, FL? ▸
02 How do I apply for a building permit in Cross City, FL? ▸
03 How do I schedule a building inspection in Cross City, FL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Cross City Town Hall / City Clerk before applying. Jaspector is not legal advice.