How to apply for a building permit in Town of Andover, Connecticut. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2022 Connecticut State Building Code
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building and Land Use Department

Street address
Building and Land Use Dept, 17 School Road, Andover, CT 06232
Coverage
Town department for Andover parcels; health-regulated septic and well work is routed separately to Eastern Highlands Health District where applicable.
Online portal
PermitLink
PermitLink
§ 02

When a permit is required

Permit triggers and exempt work for Andover

Town page states a building permit is required by Connecticut statute for changes made to real estate and all building permits must be applied for online.

Note: No standalone town exemption list located on the public page. Use Connecticut code exemptions where the town has not posted a local list.

Required documents
  • Permit application
  • Scanned PDFs of required paperwork
  • Plans/specifications as applicable
  • Related zoning, wetlands, or health submissions
Building code
2022 Connecticut State Building Code
Permit validity
Thin public data; use state 180-day start/suspension rule unless extended by the building official.
Owner-builder
Owners can use the public computer outside the building office and apply directly; thin public data on owner affidavit forms.
Contractor requirements
State trade and home improvement requirements apply.
§ 03

Application process

Typical processing: Not posted; permit is not approved until the town receives the correct fee amount

  1. 01
    Review the town Application Checklist and Fee Structure before starting the permit.
  2. 02
    Scan required materials to PDF and apply online through PermitLink.
  3. 03
    Pay through PermitLink or mail/drop off a check to Andover Town Hall, Attention: Building Dept.
  4. 04
    Respond to review comments and upload any missing items.
  5. 05
    Receive permit approval and schedule required inspections.
  6. 06
    Submit required concrete supplier and installer information before CO or completion closeout if the project includes concrete foundations.

Typical processing time: Not posted; permit is not approved until the town receives the correct fee amount

Source: Building and Land Use Department ↗

§ 04

Fee schedule

Andover building permit fees

Fee type
Amount
01
Minimum permit fee
$30 town fee minimum, plus state fee and processing fee
02
Plan check fee
Not separately posted
03
Permit fee formula
$15 per $1,000 of construction value, plus $0.26 per $1,000 state education fee, plus $15 permit processing fee
04
Reinspection fee
Not clearly posted on the public page; thin data

Pay in PermitLink or by check payable to Town of Andover mailed or dropped off at 17 School Road

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Through the Building and Land Use Department after online filing (department)

Typical sequence: Project-specific required inspections after permit issuance and before completion

§ 06

Frequently asked

Common questions about Andover permits

01 Do I need a building permit in Andover, CT?
Town page states a building permit is required by Connecticut statute for changes made to real estate and all building permits must be applied for online.
02 How much does a building permit cost in Andover, CT?
Building permit fees in Andover, CT are set by the local building department and vary by project type and valuation. The minimum permit fee is $30 town fee minimum, plus state fee and processing fee. Fees are calculated as: $15 per $1,000 of construction value, plus $0.26 per $1,000 state education fee, plus $15 permit processing fee. Plan check fee: Not separately posted.
03 How do I apply for a building permit in Andover, CT?
To apply for a building permit in Andover, CT, follow these steps: 1. Review the town Application Checklist and Fee Structure before starting the permit. 2. Scan required materials to PDF and apply online through PermitLink. 3. Pay through PermitLink or mail/drop off a check to Andover Town Hall, Attention: Building Dept. 4. Respond to review comments and upload any missing items. 5. Receive permit approval and schedule required inspections. 6. Submit required concrete supplier and installer information before CO or completion closeout if the project includes concrete foundations.
04 How long does it take to get a building permit in Andover, CT?
Building permit processing times in Andover, CT typically run Not posted; permit is not approved until the town receives the correct fee amount. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Andover, CT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Andover, CT via: Through the Building and Land Use Department after online filing.
last verified April 2026 source Building and Land Use Department ↗ entry id permits/connecticut/tolland/andover

Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Land Use Department before applying. Jaspector is not legal advice.