jaspector
City building permits

Town of Preston

How to apply for a building permit in Town of Preston, Connecticut. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2022 Connecticut State Building Code.
Avg processing
Not publicly posted.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of Preston Building Official

Street address
389 Route 2, Preston, CT 06365
Coverage
Covers the Town of Preston only.
Online portal
CivicPlus municipal website; no separate public transaction portal clearly identified from reviewed sources
CivicPlus municipal website; no separate public transaction portal clearly identified from reviewed sources
§ 02

When a permit is required

Permit triggers and exempt work for Preston

New buildings, additions, structural changes, occupancy changes, and most trade work.

Detached accessory structures up to 200 square feet
Fences up to 7 feet
Low retaining walls without surcharge
Sidewalks and driveways not over occupied space
Non-structural finish work
  • Exempt Detached accessory structures up to 200 square feet
  • Exempt Fences up to 7 feet
  • Exempt Low retaining walls without surcharge
  • Exempt Sidewalks and driveways not over occupied space
  • Exempt Non-structural finish work
Required documents
  • Permit application
  • plans
  • site plan
  • valuation
  • contractor credentials
  • related local approvals.
Building code
2022 Connecticut State Building Code.
Permit validity
State-code 180 day rule unless extended.
Owner-builder
Owners may generally self-apply, but state licensing rules still govern covered trades.
Contractor requirements
Connecticut trade licenses and home improvement registration rules apply.
§ 03

Application process

Typical processing: Not publicly posted.

  1. 01
    Obtain the current permit application and fee schedule from the Building Department or Document Center.
  2. 02
    Prepare plans, site plan, valuation, contractor credentials, and any zoning, health, wetlands, or floodplain approvals.
  3. 03
    Submit to the Building Official for review and fee calculation under the posted fee schedule.
  4. 04
    Permit issues after approval and payment; schedule inspections before covering work and at project completion.

Typical processing time: Not publicly posted.

Source: Town of Preston Building Official ↗

§ 04

Fee schedule

Preston building permit fees

Fee type
Amount
01
Minimum permit fee
See posted schedule; the town publishes current building and fire marshal fees in the linked PDF
02
Plan check fee
Included or itemized per the posted schedule; verify by permit type
03
Permit fee formula
Posted building and fire marshal schedule with itemized charges
04
Reinspection fee
Posted in the adopted fee schedule where applicable

Use the town's current fee schedule and verify payment type with Town Hall.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Call the Building Official (department)
Inspection hours
Not publicly posted

Typical sequence: Footing, foundation, framing, rough trades, insulation or energy, final

The posted fee schedule should be checked for reinspection or related charges.

§ 06

Frequently asked

Common questions about Preston permits

01 Do I need a building permit in Preston, CT?
New buildings, additions, structural changes, occupancy changes, and most trade work.
02 How much does a building permit cost in Preston, CT?
Building permit fees in Preston, CT are set by the local building department and vary by project type and valuation. The minimum permit fee is See posted schedule; the town publishes current building and fire marshal fees in the linked PDF. Fees are calculated as: Posted building and fire marshal schedule with itemized charges. Plan check fee: Included or itemized per the posted schedule; verify by permit type.
03 How do I apply for a building permit in Preston, CT?
To apply for a building permit in Preston, CT, follow these steps: 1. Obtain the current permit application and fee schedule from the Building Department or Document Center. 2. Prepare plans, site plan, valuation, contractor credentials, and any zoning, health, wetlands, or floodplain approvals. 3. Submit to the Building Official for review and fee calculation under the posted fee schedule. 4. Permit issues after approval and payment; schedule inspections before covering work and at project completion.
04 How long does it take to get a building permit in Preston, CT?
Building permit processing times in Preston, CT typically run Not publicly posted.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Preston, CT?
Not all construction work requires a permit in Preston, CT. The following work is generally exempt: Detached accessory structures up to 200 square feet; Fences up to 7 feet; Low retaining walls without surcharge; Sidewalks and driveways not over occupied space; Non-structural finish work. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Preston, CT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Preston, CT via: Call the Building Official.
last verified April 2026 source Town of Preston Building Official ↗ entry id permits/connecticut/new-london/preston

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Preston Building Official before applying. Jaspector is not legal advice.