jaspector
City building permits

City of Holyoke

How to apply for a building permit in City of Holyoke, Colorado. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Holyoke Building Department

Street address
City Hall Annex, Room 300, 20 Korean Veterans Plaza, Holyoke, MA 01040
Coverage
City of Holyoke city limits
Online portal
CitySquared
CitySquared
§ 02

When a permit is required

Permit triggers and exempt work for Holyoke

Permit required for building, wiring, plumbing, gas, sheet metal, zoning, and floodplain development.

Note: The accessible page does not provide a complete public exemption list in-line.

Required documents
  • Application plus project-specific plans or checklists
Building code
The building department enforces the State Building Code, Plumbing and Gas Code, Electrical Code, Architectural Access Code, zoning ordinances, floodplain rules, and special permit conditions.
Permit validity
Temporary Certificates of Occupancy are issued every 30 days; ordinary permit expiration is not clearly summarized on the page.
Contractor requirements
The city references HIC and CSL checks and project-specific permit checklists.

Source: City of Holyoke Building Department ↗

§ 03

Application process

Typical processing: Roughly 7 days for mailed applications to be entered into the system.

  1. 01
    Determine whether the work needs a building, electrical, plumbing, gas, zoning, floodplain, or other permit.
  2. 02
    Prepare the application and supporting documents.
  3. 03
    Apply and pay online, or submit in person, or email the application.
  4. 04
    The city scans paper into its online permitting system.
  5. 05
    City reviews the submission and communicates by email.
  6. 06
    For mail-in applications, the city says processing can take about 7 days before status appears online.

Typical processing time: Roughly 7 days for mailed applications to be entered into the system.

Source: City of Holyoke Building Department ↗

§ 04

Fee schedule

Holyoke building permit fees

Fee type
Amount
01
Minimum permit fee
Residential new construction minimum $100; commercial new construction and addition minimum $200
02
Plan check fee
$50 plan review or preliminary plan review, plus a separate Holyoke Fire Department plan review fee of $0.05 per sq ft for certain projects
03
Permit fee formula
Residential new construction: $0.45 per sq ft, minimum $100; residential alterations and repairs: $75 plus $0.20 per sq ft; commercial business, assembly, mercantile: $0.50 per sq ft; commercial multifamily residential: $0.40 per sq ft; commercial storage: $0.30 per sq ft
04
Reinspection fee
Reinspection of incomplete, partial, or missed inspections is at least $40.
05
Penalty (no permit)
Work started before permit doubles the permit fee except in an emergency.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Inspector office hours are 8:30 am to 9:30 am and 1:00 pm to 2:00 pm every day except Wednesdays and weekends.

Typical sequence: Plan review, permit issuance, inspections, and final paperwork.

Source: City of Holyoke Building Department ↗

§ 06

Frequently asked

Common questions about Holyoke permits

01 Do I need a building permit in Holyoke, CO?
Permit required for building, wiring, plumbing, gas, sheet metal, zoning, and floodplain development.
02 How much does a building permit cost in Holyoke, CO?
Building permit fees in Holyoke, CO are set by the local building department and vary by project type and valuation. The minimum permit fee is Residential new construction minimum $100; commercial new construction and addition minimum $200. Fees are calculated as: Residential new construction: $0.45 per sq ft, minimum $100; residential alterations and repairs: $75 plus $0.20 per sq ft; commercial business, assembly, mercantile: $0.50 per sq ft; commercial multifamily residential: $0.40 per sq ft; commercial storage: $0.30 per sq ft. Plan check fee: $50 plan review or preliminary plan review, plus a separate Holyoke Fire Department plan review fee of $0.05 per sq ft for certain projects.
03 How do I apply for a building permit in Holyoke, CO?
To apply for a building permit in Holyoke, CO, follow these steps: 1. Determine whether the work needs a building, electrical, plumbing, gas, zoning, floodplain, or other permit. 2. Prepare the application and supporting documents. 3. Apply and pay online, or submit in person, or email the application. 4. The city scans paper into its online permitting system. 5. City reviews the submission and communicates by email. 6. For mail-in applications, the city says processing can take about 7 days before status appears online.
04 How long does it take to get a building permit in Holyoke, CO?
Building permit processing times in Holyoke, CO typically run Roughly 7 days for mailed applications to be entered into the system.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Holyoke, CO?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Holyoke, CO via: Building Department, Building Department, Online permitting system.
last verified April 2026 source City of Holyoke Building Department ↗ entry id permits/colorado/phillips/holyoke

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Holyoke Building Department before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Phillips County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Phillips County jurisdictions →