When a permit is required
Permit triggers and exempt work for Ouray County
Any building or structure that is erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted, or demolished requires a building permit.
- Exempt New cabinets in kitchen or bath
- Exempt Cosmetic interior remodeling
- Exempt Moving or removing non-structural walls
- Exempt Minor repairs to electrical or plumbing, subject to state rules
- Exempt Replacement of light fixtures, subject to code
- Exempt Non-structural work such as window and door replacement and interior refinishing like painting or wallpapering
- Exempt One-story detached storage buildings under 200 square feet
- Exempt Fences not more than 7 feet tall
- Exempt Retaining walls not more than 4 feet tall measured from base of footer to top of wall
- Exempt Platforms and walks not more than 30 inches above grade and not over a basement or story below
- Exempt Yurts placed directly on the ground with no foundation and no ground disturbance may not require a permit
- County checklist and forms
- Site plan
- Building plans
- PDF submittals
- Address permit
- Driveway permit
- Authorization of agent form if applicable
- Wildfire review forms where applicable
- Other project-specific forms
- Building code
- 2018 International Building Code, 2018 International Residential Code, 2018 International Mechanical Code, 2018 International Energy Conservation Code, and the Abatement of Dangerous Buildings, 1997 edition
- Permit validity
- Permit valid for one year from issue; if work does not commence or continue during that year, the permit becomes void and fees are forfeited; extensions may be requested.
- Owner-builder
- Owners, contractors, or authorized agents may apply; property owners must sign an authorization of agent form to designate another person to act as general contractor.
- Contractor requirements
- Subcontractors may be listed but are not issued permits; state electrical and plumbing permits are separate.
Application process
Typical processing: Two to four weeks, longer for complex or incomplete submittals.
- 01 Confirm zoning, access, water, septic, and wildfire constraints before finalizing plans.
- 02 Prepare application materials and plans in electronic PDF format.
- 03 Submit the permit application in CloudPermit.
- 04 County review takes about two to four weeks, longer for complex or incomplete submittals.
- 05 Respond to correction requests, then obtain permit issuance.
- 06 Schedule required inspections, including any engineer-performed foundation inspections.
Typical processing time: Two to four weeks, longer for complex or incomplete submittals.
Fee schedule
Effective 2018
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2018) before budgeting.
Required inspections
Scheduling and sequence
- CloudPermit (online)
- 970-626-9775 (phone)
- Scheduling deadline
- Inspection requests must be made at least 24 hours in advance.
Typical sequence: County requires engineer inspections for footings, caissons, and foundation wall inspections, with a stamped report to the building official; final approval requires all required inspections and compliance items before certificate of occupancy.
Frequently asked
Common questions about unincorporated Ouray County permits
01 Do I need a building permit in unincorporated Ouray County, CO? ▸
02 How much does a building permit cost in unincorporated Ouray County, CO? ▸
03 How do I apply for a building permit in unincorporated Ouray County, CO? ▸
04 How long does it take to get a building permit in unincorporated Ouray County, CO? ▸
05 What work is exempt from building permits in unincorporated Ouray County, CO? ▸
06 How do I schedule a building inspection in unincorporated Ouray County, CO? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Ouray County Land Use Department before applying. Jaspector is not legal advice.