Town of Peetz

How to apply for a building permit in Town of Peetz, Colorado. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of Peetz permit committee / town hall

Street address
621 Main Street, PO Box 7, Peetz, CO 80747
Coverage
Town of Peetz incorporated limits
Online portal
Town of Peetz permits and licenses
Wix-hosted town site with permit information pages
§ 02

When a permit is required

Permit triggers and exempt work for Peetz

Permits are required when building projects increase square footage.

Note: Public exemption list not clearly published.

Permit validity
Permit notice is posted for the construction period or until permit application expires; 30 day grace period may be granted by permit committee.

Source: Town of Peetz permit committee / town hall ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Permit committee members receive building permit applications and may approve, disapprove, or refer applications.
  2. 02
    Permit notice is provided after application approval and must be posted during construction.
  3. 03
    Permit expiration grace period may be granted for 30 days without fees if construction is not complete.

Source: Town of Peetz permit committee / town hall ↗

§ 04

Fee schedule

Peetz building permit fees

Fee type
Amount
01
Minimum permit fee
$30 for storage shed 16x20 or less; $30 for deck, cement patio, and driveway.
02
Permit fee formula
New home $300; mobile/modular home $100; additional room $50 each; double garage $100; single garage $50; storage shed over 16x20 $50; business/commercial 1% of total construction cost.
03
Penalty (no permit)
Swimming pool permit violation fine: $100 added to utility bill; permit expiration renewal after grace period requires original fee again.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

Typical sequence: Permit committee may perform on-site inspections to verify compliance with the original permit.

Source: Town of Peetz permit committee / town hall ↗

§ 06

Frequently asked

Common questions about Peetz permits

01 Do I need a building permit in Peetz, CO?
Permits are required when building projects increase square footage.
02 How much does a building permit cost in Peetz, CO?
Building permit fees in Peetz, CO are set by the local building department and vary by project type and valuation. The minimum permit fee is $30 for storage shed 16x20 or less; $30 for deck, cement patio, and driveway.. Fees are calculated as: New home $300; mobile/modular home $100; additional room $50 each; double garage $100; single garage $50; storage shed over 16x20 $50; business/commercial 1% of total construction cost..
03 How do I apply for a building permit in Peetz, CO?
To apply for a building permit in Peetz, CO, follow these steps: 1. Permit committee members receive building permit applications and may approve, disapprove, or refer applications. 2. Permit notice is provided after application approval and must be posted during construction. 3. Permit expiration grace period may be granted for 30 days without fees if construction is not complete.
last verified April 2026 source Town of Peetz permit committee / town hall ↗ entry id permits/colorado/logan/town-of-peetz

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Peetz permit committee / town hall before applying. Jaspector is not legal advice.