When a permit is required
Permit triggers and exempt work for Chico
A basic building permit is required for erection, construction, enlargement, alteration, repair, improvement, moving, removal, conversion, or demolition of buildings or structures in the city. Separate electrical, mechanical, and plumbing permits are required for installation, alteration, repair, replacement, or remodeling of those systems unless an exemption applies.
- Exempt One-story detached accessory structures such as tool sheds, storage sheds, and playhouses with projected roof area not over 120 square feet
- Exempt Fences not over 6 feet high
- Exempt Movable cases, counters, and partitions not over 5 feet high
- Exempt Retaining walls not over 4 feet high unless supporting a surcharge or impounding flammable liquids
- Exempt Grade-supported water tanks up to 500 gallons with height-to-width ratio not over 2:1
- Exempt Platforms, walks, and driveways not more than 30 inches above grade and not over a basement or story below
- Exempt Painting, papering, and similar finish work
- Exempt Temporary motion picture, television, and theater stage sets and scenery
- Exempt Certain limited window awnings
- Exempt Certain above-grade prefabricated swimming pools accessory to Group R-3 occupancies up to 5,000 gallons
- Exempt Certain ground-mounted satellite dish antennas serving a single-family dwelling
- Exempt Portable electrical equipment not permanently connected to supply, replacement of lamps and fuses, and minor electrical repair work
- Exempt Portable heating, ventilating, or cooling units, certain closed piping within heating or cooling equipment, unchanged replacement components, and unit refrigerating systems
- Exempt Minor plumbing leak repairs and drain or pipe cleaning that do not require rearrangement or replacement of valves, pipes, traps, or fixtures
Note: Chico's code also references broader exemptions already built into the adopted standards under Chapter 16.06. Exemptions do not override zoning, fire, utility, or other applicable approvals, and permits are still required when work exceeds the stated limits or involves structural support, system rearrangement, or other code-triggering conditions.
- Permit application
- Description of work
- Project address
- Legal owner name, address, and phone
- Valuation
- Construction type and occupancy type
- Digital plan set and supporting documents
- Structural calculations where required
- Contractor license and City business license information for contractors
- Workers' compensation information if employees are used
- Owner-builder statement for owner-builders
- Building code
- Chico's municipal code supplement current through Ordinance No. 2619, adopted January 6, 2026, reflects adoption of the 2025 California Building Standards code set in Title 16R, including current California building, plumbing, mechanical, electrical, energy, green building, fire, and wildland-urban interface standards.
- Permit validity
- Chico Municipal Code Section 16.10.180 currently states a permit expires if work does not start within 180 days after issuance, or if work is suspended or abandoned for 180 consecutive days after starting. The Building Official may grant one extension up to 180 days on request. If a permit expires after work has started, renewal is 50% of the building permit fee if there are no plan changes and the suspension has not exceeded 1 year.
- Owner-builder
- Property owners may obtain permits for work on owner-occupied single-family or duplex buildings. If the owner hires workers, workers' compensation requirements may apply, and an owner-builder statement is required before permit issuance.
- Contractor requirements
- Contractors must hold a current City of Chico business license and current California contractor license. If employees are used, workers' compensation carrier and policy information must be supplied.
Application process
Typical processing: Over the counter for some simple permits; about 3 weeks for most projects requiring review.
- 01 Confirm the project scope, permit type, and zoning. Chico publishes permit types available online through eTRAKiT, and zoning and development standards are administered through the Planning Division and Title 19 of the municipal code.
- 02 Create a free eTRAKiT account. First-time contractors must have a valid City of Chico business license number and California contractor license number, and must call the Building Division to be set up.
- 03 Submit the permit application and digital documents. Chico states that applications, plans, and documents are to be submitted in digital format; first-time submittals must include the permit application.
- 04 Include the required project information and plans. Chico asks for the work description, project address, legal owner contact information, valuation, and construction or occupancy type; plans, specifications, and structural calculations may also be required depending on scope.
- 05 Wait for review and staff follow-up. Simple work such as reroofs, water heaters, window replacements, and termite repair may be over the counter; for most projects, the City says plan review can usually be completed within about 3 weeks of submittal.
- 06 Pay fees, obtain permit issuance, then schedule inspections through eTRAKiT or by phone. Final approval is required to complete the permit.
Typical processing time: Over the counter for some simple permits; about 3 weeks for most projects requiring review.
Source: City of Chico Community Development Department, Building Division ↗
Fee schedule
Chico building permit fees
eTRAKiT allows online fee payment. The Building FAQ says fees may be paid in cash, personal check, money order, or credit card (Visa or Mastercard). Financial transactions are not accepted after 4:00 p.m. at the Building Division counter.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- eTRAKiT (online)
- (530) 879-6700 (phone)
- Scheduling deadline
- Inspections may be scheduled online until 3:00 p.m. the workday before the requested inspection date; cancellations may be made online until 7:00 a.m. the day of inspection. Weekend requests submitted over the weekend can be scheduled for Tuesday at the earliest.
- Time windows
- Inspectors do not call to set a specific arrival time, so someone 18 or older must be on site during the requested time period.
Typical sequence: Typical posted sequences move from erosion control, footing, foundation, slab, and underground utilities to rough frame, rough electrical, rough mechanical, rough plumbing, then insulation, lath, gypsum, and finals. The municipal code separately identifies foundation, frame, lath or wallboard, and final inspection stages, with final fire inspection required for applicable occupancies.
Source: City of Chico Community Development Department, Building Division ↗
Frequently asked
Common questions about Chico permits
01 Do I need a building permit in Chico, CA? ▸
02 How much does a building permit cost in Chico, CA? ▸
03 How do I apply for a building permit in Chico, CA? ▸
04 How long does it take to get a building permit in Chico, CA? ▸
05 What work is exempt from building permits in Chico, CA? ▸
06 How do I schedule a building inspection in Chico, CA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Chico Community Development Department, Building Division before applying. Jaspector is not legal advice.