On this page 4
When a permit is required
Permit triggers and exempt work for Searcy
Erecting, altering, or enlarging any structure; installing, altering, repairing, or replacing regulated electrical, gas, mechanical, or plumbing work.
- permit application, trade-specific applications, and supporting documents as required by the department.
- Building code
- Arkansas Fire Prevention Code 2021 edition; Arkansas State Plumbing Code 2018; Arkansas State Gas Code 2018; International Mechanical Code 2021; National Electric Code 2020; local Searcy ordinances and zoning code.
- Owner-builder
- Homeowners may perform work on their primary residence without a license, but permits and inspections are still required.
- Contractor requirements
- Proof of licensing required by contractors.
Required inspections
Scheduling and sequence
- Email permits@cityofsearcy.org (contact)
- Inspection hours
- Planning and Development office is open Mon-Fri 8:00 am to 4:30 pm
Typical sequence: inspections must occur before insulation or finish materials are covered; final inspections before occupancy
if an inspection does not pass, time is given to correct issues and a reinspection must be requested
Frequently asked
Common questions about Searcy permits
01 Do I need a building permit in Searcy, AR? ▸
02 How long does it take to get a building permit in Searcy, AR? ▸
03 How do I schedule a building inspection in Searcy, AR? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Planning and Development / Code Enforcement before applying. Jaspector is not legal advice.